Funding Program: | Roads to Recovery Program |
Status: | Completed |
Transport Mode: | Road |
Expected Start/Finish: | Mar 2014 - Jun 2014 |
Australian Government Contribution: | $240,504 |
Local Council/Shire: | Greater Shepparton City Council |
State: | VIC |
Project DescriptionRoad pavement failure including depressions, crocidile cracking, and shoving as a result of water inundation into road pavement from kerb and channel failure
Replace kerb and channel on north and south side of street from Wyndham Street heading east for 338m. Total kerb and channel replaced will be 654 lineal metres. Road seal and pavement will be profiled out at 40mm, primed and sprayed with Strained Alleviated Membrane (SAM) seal. Supply and lay 10mm H-Asphalt at 40mm. |
Disclaimer: The material contained in this site is made available
on the understanding that the Department is not thereby engaged in rendering professional
advice for a particular purpose. Before relying on the material in any important
matter, users should carefully evaluate the accuracy, completeness and relevance
of the information for their purposes and should obtain appropriate professional
advice relevant to their particular circumstances.
Project details last updated: 10/08/2014