Funding Program: | Roads to Recovery Program |
Status: | Completed |
Transport Mode: | Road |
Expected Start/Finish: | Oct 2013 - Dec 2013 |
Australian Government Contribution: | $250,000 |
Local Council/Shire: | Monash City Council |
State: | VIC |
Project DescriptionOld failing pavement with potholes, poor shape and steep crossfall causing problems, failing kerb and channel and inadequate drainage.
Reconstruction/rehabilitation of the existing road pavement to address pavement failure and replacement of kerb and channel and driveways to address the poor shape, crossfall and failed kerb and channel and the construction of additional drainage within the road reserve to address the drainage deficiency. The roadwidth to be reconstructed is 7.2m back to back of kerb and channel and approximately 290m in length
Total cost of proposed project is $300,000 |
Disclaimer: The material contained in this site is made available
on the understanding that the Department is not thereby engaged in rendering professional
advice for a particular purpose. Before relying on the material in any important
matter, users should carefully evaluate the accuracy, completeness and relevance
of the information for their purposes and should obtain appropriate professional
advice relevant to their particular circumstances.
Project details last updated: 10/05/2014