Funding Program: | Roads to Recovery Program |
Status: | Completed |
Transport Mode: | Road |
Expected Start/Finish: | Oct 2013 - May 2014 |
Australian Government Contribution: | $16,816 |
Local Council/Shire: | Shire of West Arthur |
State: | WA |
Project DescriptionPoorly drained, salt affected and shoved, 6.2 metres wide aging bitumen sealed road.
Construct deep drainage and outfall, install subsoil drainage to spring where required, lift an average 150mm and widen existing gravel base to 9 metre, cement stabilise to 150mm deep. seal to 7 metre wide with C170 bitumen and 14mm stone.
Total cost of proposed project is $171,962 |
Disclaimer: The material contained in this site is made available
on the understanding that the Department is not thereby engaged in rendering professional
advice for a particular purpose. Before relying on the material in any important
matter, users should carefully evaluate the accuracy, completeness and relevance
of the information for their purposes and should obtain appropriate professional
advice relevant to their particular circumstances.
Project details last updated: 10/08/2014