Funding Program: | Roads to Recovery Program |
Status: | Completed |
Transport Mode: | Road |
Expected Start/Finish: | Nov 2014 - Apr 2015 |
Australian Government Contribution: | $500,000 |
Local Council/Shire: | City of Wanneroo |
State: | WA |
Project DescriptionSubstandard existing road carriageway, with limited stormwater drainage control. NOTE: This road forms part of "Old" Quinns Rocks that was originally developed as a seaside holiday location and is now surrounded by new land subdivisonal development.
Rehabilitation of the existing carriageway (where required) and associated stormwater drainage system upgrade to urban subdivisonal standard for the full length of the road. Works will also include upgrade of existing kerbing, replacement of the existing footpath (where required) and reconnection of existing vehicle crossovers impacted by the drainage works.
Total cost of proposed project is $600,000 |
Disclaimer: The material contained in this site is made available
on the understanding that the Department is not thereby engaged in rendering professional
advice for a particular purpose. Before relying on the material in any important
matter, users should carefully evaluate the accuracy, completeness and relevance
of the information for their purposes and should obtain appropriate professional
advice relevant to their particular circumstances.
Project details last updated: 10/08/2015