Funding Program: | Roads to Recovery Program |
Status: | Completed |
Transport Mode: | Road |
Expected Start/Finish: | Oct 2014 - Dec 2014 |
Australian Government Contribution: | $400,802 |
Local Council/Shire: | Shire of Upper Gascoyne |
State: | WA |
Project DescriptionVarious sections are particularly rocky and require sheeting to provide a safer running surface and less tyre damage for an increasing amount of tourist traffic with caravans and camper trailers.Other sections require resheeting to provide a more durable and safe running surface with the increase in traffic and mix of stock transport with tourist traffic.
Suitable local material will be used to sheet and water bind the rocky sections and less durable soil sections to enhance the durable life of the formed road surface particularly during dry conditions.
Total cost of proposed project is $739,775 |
Disclaimer: The material contained in this site is made available
on the understanding that the Department is not thereby engaged in rendering professional
advice for a particular purpose. Before relying on the material in any important
matter, users should carefully evaluate the accuracy, completeness and relevance
of the information for their purposes and should obtain appropriate professional
advice relevant to their particular circumstances.
Project details last updated: 10/02/2015