Funding Program: | Roads to Recovery Program |
Status: | Completed |
Transport Mode: | Road |
Expected Start/Finish: | Jul 2015 - Feb 2016 |
Australian Government Contribution: | $691,583 |
Local Council/Shire: | Coffs Harbour City Council |
State: | NSW |
Project DescriptionThe pavement has deteriorated and is potholed and deformed. It is past its useful life. A rough ride is evident and poses a risk to motorists
Total Pavement reconstruction by box out and replacement, with some kerb and gutter construction with hot bitumen seal (1920m2). Geotechnical investigation revealed that existing pavement was not suitable for stabilisation. Subsoil drains required in some areas |
Disclaimer: The material contained in this site is made available
on the understanding that the Department is not thereby engaged in rendering professional
advice for a particular purpose. Before relying on the material in any important
matter, users should carefully evaluate the accuracy, completeness and relevance
of the information for their purposes and should obtain appropriate professional
advice relevant to their particular circumstances.
Project details last updated: 10/04/2016