Funding Program: | Roads to Recovery Program |
Status: | Completed |
Transport Mode: | Road |
Expected Start/Finish: | Dec 2014 - Apr 2015 |
Australian Government Contribution: | $442,398 |
Local Council/Shire: | City of Mitcham |
State: | SA |
Project DescriptionThe kerb and water table on both sides of Carruth Road are displaced both vertically and horizontally due to soil movement and tree growth. The road pavement is significantly deformed due to the reactive sub-grades in the area. Carruth Road is classified as a collector road with a vehicle traffic volume of 2,377 vehicles per day.
It is proposed to replace all of the kerbing on both sides of Carruth Road. The kerb replacement will be followed by the removal of the road seal and pavement. The road will be replaced with a 100mm Asphalt pavement followed with 40mm Asphalt seal. The project includes the replacement of an existing roundabout at the intersection of Barrelder Road and Carruth Road. |
Disclaimer: The material contained in this site is made available
on the understanding that the Department is not thereby engaged in rendering professional
advice for a particular purpose. Before relying on the material in any important
matter, users should carefully evaluate the accuracy, completeness and relevance
of the information for their purposes and should obtain appropriate professional
advice relevant to their particular circumstances.
Project details last updated: 10/08/2015