Funding Program: | Roads to Recovery Program |
Status: | Completed |
Transport Mode: | Road |
Expected Start/Finish: | Dec 2014 - May 2016 |
Australian Government Contribution: | $1,193,399 |
State: | SA |
Project DescriptionThe floodways to be upgraded scour heavily after moderate flows, causing road closures and posing road hazards to the travelling public and the local community. There are also significant maintenance costs associated with the reinstatement of these floodways.
The work will consist of excavating existing material and replacing with crushed rock, this will then be stabilised with cement and concrete toewalls will be constructed to prevent under-mining. The floodways vary in length from 100 to 200 metres and will be 10 metres in width. |
Disclaimer: The material contained in this site is made available
on the understanding that the Department is not thereby engaged in rendering professional
advice for a particular purpose. Before relying on the material in any important
matter, users should carefully evaluate the accuracy, completeness and relevance
of the information for their purposes and should obtain appropriate professional
advice relevant to their particular circumstances.
Project details last updated: 10/08/2016