Funding Program: | Roads to Recovery Program |
Status: | Completed |
Transport Mode: | Road |
Expected Start/Finish: | Mar 2015 - Oct 2015 |
Australian Government Contribution: | $173,985 |
Local Council/Shire: | Parramatta City Council |
State: | NSW |
Project DescriptionThe road surface is old and brittle. It has been affected by cracks and potholes, which makes it very rough to drive on. The disintegration of asphalt at road edges has also occured. Some sections of kerbs have been damaged and displaced.
The proposed work will include repair of failed pavement areas and resurfacing of the road with asphalt. Damaged or displaced sections of kerbs and gutters will be repaired before resurfacing. Length = 213 m; Width = 12 m; Area = 2556 m2.
Total cost of proposed project is $276,377 |
Disclaimer: The material contained in this site is made available
on the understanding that the Department is not thereby engaged in rendering professional
advice for a particular purpose. Before relying on the material in any important
matter, users should carefully evaluate the accuracy, completeness and relevance
of the information for their purposes and should obtain appropriate professional
advice relevant to their particular circumstances.
Project details last updated: 10/07/2016