Funding Program: | Roads to Recovery Program |
Status: | Completed |
Transport Mode: | Road |
Expected Start/Finish: | Mar 2015 - Dec 2016 |
Australian Government Contribution: | $197,067 |
State: | NSW |
Project DescriptionThe road surface has been affected by numerous cracks, potholes and failed pavement areas. It is very rough due to existing pavement defects and repair patches. Some sections of kerbs and gutters have been displaced by tree roots.
The proposed work will include the replacement of damaged sections of kerbs and gutters, replacement of substandard pavement materials with asphalt and resurfacing of the road with asphalt. Length = 240 m; Width = 10.2 m; Area = 2448 m2.
Total cost of proposed project is $297,186 |
Disclaimer: The material contained in this site is made available
on the understanding that the Department is not thereby engaged in rendering professional
advice for a particular purpose. Before relying on the material in any important
matter, users should carefully evaluate the accuracy, completeness and relevance
of the information for their purposes and should obtain appropriate professional
advice relevant to their particular circumstances.
Project details last updated: 10/08/2017