Funding Program: | Roads to Recovery Program |
Status: | Completed |
Transport Mode: | Road |
Expected Start/Finish: | Mar 2015 - Mar 2015 |
Australian Government Contribution: | $82,425 |
Local Council/Shire: | City of Port Phillip |
State: | VIC |
Project DescriptionDeformed Asphalt surface has been identified through road inspections. The pavement surface has changed from originally constructed profile, which may directly influence the riding quality, water ponding and skid resistance. Asphalt resheeting improves pavement performance with regard to the strength and riding quality.
30mm minimum (approx 40mm) depth asphalt overlay of the existing surface along 206m and 11.9m width (area = 2451m2) |
Disclaimer: The material contained in this site is made available
on the understanding that the Department is not thereby engaged in rendering professional
advice for a particular purpose. Before relying on the material in any important
matter, users should carefully evaluate the accuracy, completeness and relevance
of the information for their purposes and should obtain appropriate professional
advice relevant to their particular circumstances.
Project details last updated: 10/05/2015