Funding Program: | Roads to Recovery Program |
Status: | Completed |
Transport Mode: | Road |
Expected Start/Finish: | May 2015 - May 2015 |
Australian Government Contribution: | $70,449 |
Local Council/Shire: | Gilgandra Council |
State: | NSW |
Project DescriptionRoad is mostly constructed from a sandy loam material on black clay, resulting in extensive dust bog holes in the dry periods and in wet periods becomes extremely boggy and slippery.
Chemical Stabilisation Treatment – Rip and shape existing road – Using a road stabilisation machine (Pulvie) and a lime spreader mix the existing material to a depth of 300mm or greater while incorporating the lime. Re-shape and compact finished material to conform with road design. |
Disclaimer: The material contained in this site is made available
on the understanding that the Department is not thereby engaged in rendering professional
advice for a particular purpose. Before relying on the material in any important
matter, users should carefully evaluate the accuracy, completeness and relevance
of the information for their purposes and should obtain appropriate professional
advice relevant to their particular circumstances.
Project details last updated: 10/08/2015