Funding Program: | Roads to Recovery Program |
Status: | Completed |
Transport Mode: | Road |
Expected Start/Finish: | Jan 2015 - Mar 2015 |
Australian Government Contribution: | $68,206 |
Local Council/Shire: | Shire of Trayning |
State: | WA |
Project DescriptionImproving road standards for tourism. The current width of the road is at 8 meters with a corrugated surface.
To improve conditions of the surface, gravel re-sheeting is necessary. The width of the road surface will be increased to 10 meters wide to allow for vehicles passing each other on their way to and from the Billyacatting Reserve.
A three (3) kilometer gravel re-sheeting program to re-surface poor surface condition and widen narrow carriageway.
Total cost of proposed project is $69,521 |
Disclaimer: The material contained in this site is made available
on the understanding that the Department is not thereby engaged in rendering professional
advice for a particular purpose. Before relying on the material in any important
matter, users should carefully evaluate the accuracy, completeness and relevance
of the information for their purposes and should obtain appropriate professional
advice relevant to their particular circumstances.
Project details last updated: 10/02/2016