Funding Program: | Roads to Recovery Program |
Status: | Completed |
Transport Mode: | Road |
Expected Start/Finish: | Nov 2014 - Apr 2015 |
Australian Government Contribution: | $25,000 |
Local Council/Shire: | Shire of Manjimup |
State: | WA |
Project DescriptionFor road classification and road use, the existing seal (3.5m) and pavement width are inadequate; vehicles travelling in opposite directions can not pass safely. Cross fall is inconsistent/non existent. Significant rutting exists. Extend or replace existing culverts as appropriate.
Reconstruct and widen existing road with 150mm of gravel to a pavement width of 8 metres and a seal width of 6 metres. Replace one culvert with new 450mm diameter pipe and extend one other culvert to allow construction of pavement to 8 metres. Provide headwalls to all culverts. Place culverts to vehicle crossovers to allow access to properties without hindering flow of water along table drains.
Total cost of proposed project is $371,869 |
Disclaimer: The material contained in this site is made available
on the understanding that the Department is not thereby engaged in rendering professional
advice for a particular purpose. Before relying on the material in any important
matter, users should carefully evaluate the accuracy, completeness and relevance
of the information for their purposes and should obtain appropriate professional
advice relevant to their particular circumstances.
Project details last updated: 10/08/2015