Funding Program: | Roads to Recovery Program |
Status: | Completed |
Transport Mode: | Road |
Expected Start/Finish: | Nov 2014 - Nov 2014 |
Australian Government Contribution: | $181,776 |
Local Council/Shire: | Penrith City Council |
State: | NSW |
Project DescriptionThe road was originally constructed in 1970 and is showing signs of deterioration with numerous potholes and failures.
It is proposed to stabilise the existing pavement to a depth of 250mm and provide a 2 coat seal for a length of 1050 metres and width of 6.5 metres. |
Disclaimer: The material contained in this site is made available
on the understanding that the Department is not thereby engaged in rendering professional
advice for a particular purpose. Before relying on the material in any important
matter, users should carefully evaluate the accuracy, completeness and relevance
of the information for their purposes and should obtain appropriate professional
advice relevant to their particular circumstances.
Project details last updated: 10/02/2015