Project DescriptionThe proposed section includes the following defects:
- Edge break;
- Extensive potholing;
- Pavement depressions;
- Full extent pavement rutting;
- Surface cracking; and
- Insufficient road width, safety issue.
Pavement Rehabilitation and Widening:
- Profile out existing verge;
- Match existing pavement depth for widening;
- Add 50mm granular pavement full extent;
- 220mm In-situ cement pavement stabilisation;
- Bitumen seal.
Total cost of proposed project is $584,584 |
Disclaimer: The material contained in this site is made available
on the understanding that the Department is not thereby engaged in rendering professional
advice for a particular purpose. Before relying on the material in any important
matter, users should carefully evaluate the accuracy, completeness and relevance
of the information for their purposes and should obtain appropriate professional
advice relevant to their particular circumstances.
Project details last updated: 10/02/2019