Project DescriptionThe existing asphalt surface on Fairway Drive is showing signs of failure with large cracks and potholes appearing.
The existing asphalt surface will be overlaid with a 25mm thick new asphalt surface. This will ensure the integrity of the pavement and continue to extend the life of the pavement.
Change in costs due to tender rates. |
Disclaimer: The material contained in this site is made available
on the understanding that the Department is not thereby engaged in rendering professional
advice for a particular purpose. Before relying on the material in any important
matter, users should carefully evaluate the accuracy, completeness and relevance
of the information for their purposes and should obtain appropriate professional
advice relevant to their particular circumstances.
Project details last updated: 10/07/2015