Funding Program: | Roads to Recovery Program |
Status: | Completed |
Transport Mode: | Road |
Expected Start/Finish: | Mar 2015 - May 2015 |
Australian Government Contribution: | $12,592 |
Local Council/Shire: | Bogan Shire Council |
State: | NSW |
Project DescriptionThe existing stock grid which is also used as a drainage structure for the flow of storm water is colapsing dour to inadequate concrete footings. Vehicles can not use the grid in it's present condition and drainage is impeded.
Install a new heavy vehicle stock grid to improve drainage and prevent stock from accessing the Barrier Highway.
Total cost of proposed project is $15,592 |
Disclaimer: The material contained in this site is made available
on the understanding that the Department is not thereby engaged in rendering professional
advice for a particular purpose. Before relying on the material in any important
matter, users should carefully evaluate the accuracy, completeness and relevance
of the information for their purposes and should obtain appropriate professional
advice relevant to their particular circumstances.
Project details last updated: 10/08/2015