Funding Program: | Roads to Recovery Program |
Status: | Completed |
Transport Mode: | Road |
Expected Start/Finish: | Jul 2014 - Dec 2014 |
Australian Government Contribution: | $323,097 |
Local Council/Shire: | Temora Shire Council |
State: | NSW |
Project DescriptionStage two of Howards Road Reconstruction Project. Insufficient pavement seal width of 5m-5.3m. Major Sections of pavement deformation and failure. Extensive cracking past repair by way of maintenance.
Rip and reshape existing pavement to 130mm below FSL, add 150mm loose volume of ridge gravel, insitu mix 250mm below design FSL incorporating 1.5% quicklime by weigh. Compact trim and seal with a two coat 14mm/7mm double / double C170 grade bitumen seal. |
Disclaimer: The material contained in this site is made available
on the understanding that the Department is not thereby engaged in rendering professional
advice for a particular purpose. Before relying on the material in any important
matter, users should carefully evaluate the accuracy, completeness and relevance
of the information for their purposes and should obtain appropriate professional
advice relevant to their particular circumstances.
Project details last updated: 10/05/2015