Funding Program: | Roads to Recovery Program |
Status: | Completed |
Transport Mode: | Road |
Expected Start/Finish: | Mar 2015 - May 2015 |
Australian Government Contribution: | $174,639 |
Local Council/Shire: | Wentworth Shire Council |
State: | NSW |
Project DescriptionRoad is formed from natural material and is in poor condition. Road is lower than surrounding area and floods in times of wet weather and becomes impassable. There is no drainage and path for water to escape.
Road reconstruction to design standards, involving raising the level of the road. Construction of drainage system to allow water to drain from road surface and be accessible in all weather conditions. Construction of a gravel overlay to raise road standard and reduce future maintenance. |
Disclaimer: The material contained in this site is made available
on the understanding that the Department is not thereby engaged in rendering professional
advice for a particular purpose. Before relying on the material in any important
matter, users should carefully evaluate the accuracy, completeness and relevance
of the information for their purposes and should obtain appropriate professional
advice relevant to their particular circumstances.
Project details last updated: 10/10/2016