Funding Program: | Roads to Recovery Program |
Status: | Completed |
Transport Mode: | Road |
Expected Start/Finish: | May 2015 - Jun 2015 |
Australian Government Contribution: | $23,816 |
Local Council/Shire: | Mid-Western Regional Council |
State: | NSW |
Project DescriptionThe pavement is in very poor condition, significantly out of shape and has numerous pavement failures resulting in shoves and potholes. Poor drainage results in water flowing across the road and water ponding for long periods of time on the road resulting in these failures.
It is proposed to rehabilitate the road pavement by overlaying the existing pavement material. It is proposed to rectify the drainage issues by reshaping the road, and constructing a short length of kerb and gutter to direct the water and prevent the water from crossing the road.
Total cost of proposed project is $28,153 |
Disclaimer: The material contained in this site is made available
on the understanding that the Department is not thereby engaged in rendering professional
advice for a particular purpose. Before relying on the material in any important
matter, users should carefully evaluate the accuracy, completeness and relevance
of the information for their purposes and should obtain appropriate professional
advice relevant to their particular circumstances.
Project details last updated: 10/08/2015