Project DescriptionAsphalt cracking, surface deformations with a loss of stone in the wearing course due to asphalt age and damaged kerbing are being addressed with the reconstruction of the road.
Length, width and area of job: 203m x 12.2m = 2,477m2. Reconstruct the existing top half of the base course material through wet mix construction process. Replace existing kerbing on both sides of the road and overlay full length with a new wearing course. |
Disclaimer: The material contained in this site is made available
on the understanding that the Department is not thereby engaged in rendering professional
advice for a particular purpose. Before relying on the material in any important
matter, users should carefully evaluate the accuracy, completeness and relevance
of the information for their purposes and should obtain appropriate professional
advice relevant to their particular circumstances.
Project details last updated: 10/08/2016