Funding Program: | Roads to Recovery Program |
Status: | Completed |
Transport Mode: | Road |
Expected Start/Finish: | Mar 2016 - May 2016 |
Australian Government Contribution: | $129,561 |
Local Council/Shire: | City of Belmont |
State: | WA |
Project DescriptionThe condition of the existing asphalt wearing course is poor with minor deformations and cracking evident.
Length, width and area of the job: 640m x 7.4m = 4,736m2. Kerbing is to be retained with the edge of the asphalt wearing course profiled along both kerb faces. Existing drainage structures raised to new road levels and the full length of the job overlayed. |
Disclaimer: The material contained in this site is made available
on the understanding that the Department is not thereby engaged in rendering professional
advice for a particular purpose. Before relying on the material in any important
matter, users should carefully evaluate the accuracy, completeness and relevance
of the information for their purposes and should obtain appropriate professional
advice relevant to their particular circumstances.
Project details last updated: 10/08/2016