Project DescriptionThis section of road is low lying and requires targeted forming and sheeting to get above natural surface level. The existing road material is marginal and becomes impassable at various locations following minor rainfall events.
The work will involve forming and sheeting of targeted sections with crushed rocks. Sheeting will be 150mm – 200mm in depth with a carriageway width of 9 metres. |
Disclaimer: The material contained in this site is made available
on the understanding that the Department is not thereby engaged in rendering professional
advice for a particular purpose. Before relying on the material in any important
matter, users should carefully evaluate the accuracy, completeness and relevance
of the information for their purposes and should obtain appropriate professional
advice relevant to their particular circumstances.
Project details last updated: 10/08/2018