Funding Program: | Roads to Recovery Program |
Status: | Completed |
Transport Mode: | Road |
Expected Start/Finish: | Aug 2015 - Sep 2015 |
Australian Government Contribution: | $300,000 |
Local Council/Shire: | Shire of Upper Gascoyne |
State: | WA |
Project DescriptionSections totalling 10km have a shallow uneven bedrock base resulting in previous sheeting being eroded by flood water and traffic.The surface is very rough and uneven for stock and tourist traffic and for a local indigenous community.
Reform,sheet with suitable local material to 150mm and water bind and construct a water catchment drain along northern side of the road reserve to prevent future flood water damage. |
Disclaimer: The material contained in this site is made available
on the understanding that the Department is not thereby engaged in rendering professional
advice for a particular purpose. Before relying on the material in any important
matter, users should carefully evaluate the accuracy, completeness and relevance
of the information for their purposes and should obtain appropriate professional
advice relevant to their particular circumstances.
Project details last updated: 10/11/2015