Project DescriptionThe proposed section has the following defects: extensive ravelling of the existing asphalt surfacing and oxidation due to the age and weathering of the asphalt surface. The surface has moderate failures.
Asphalt Resurfacing: Profile edges to key-in with the concrete kerb and channel; waterproofing and crack alleviation bitumen sprayed seal; and 50mm thick Dense Graded Asphalt Overlay (using 14mm nominal size aggregate).
Total cost of proposed project is $745,225 |
Disclaimer: The material contained in this site is made available
on the understanding that the Department is not thereby engaged in rendering professional
advice for a particular purpose. Before relying on the material in any important
matter, users should carefully evaluate the accuracy, completeness and relevance
of the information for their purposes and should obtain appropriate professional
advice relevant to their particular circumstances.
Project details last updated: 10/02/2019