Funding Program: | Roads to Recovery Program |
Status: | Completed |
Transport Mode: | Road |
Expected Start/Finish: | Nov 2015 - Dec 2015 |
Australian Government Contribution: | $232,313 |
Local Council/Shire: | Parramatta City Council |
State: | NSW |
Project DescriptionThe road surface has been affected by large pavement failures and cracks. The road have been patched multiple times in the past which makes it rough to drive on.
The proposed work includes repair of pavement failure by replacement with asphalt and resurfacing of the road with asphalt. Length = 300 m; Width = 12 m; Area = 3600 m2 |
Disclaimer: The material contained in this site is made available
on the understanding that the Department is not thereby engaged in rendering professional
advice for a particular purpose. Before relying on the material in any important
matter, users should carefully evaluate the accuracy, completeness and relevance
of the information for their purposes and should obtain appropriate professional
advice relevant to their particular circumstances.
Project details last updated: 10/05/2016