Funding Program: | Roads to Recovery Program |
Status: | Completed |
Transport Mode: | Road |
Expected Start/Finish: | Feb 2017 - May 2017 |
Australian Government Contribution: | $247,785 |
State: | NSW |
Project DescriptionThe road surface is affected by cracks, potholes and deformations. Some sections of kerb and gutters have been displaced. There is water ingress into road pavement from higher ground causing pavement failures.
The proposed work includes installation of subsoil drainage system, replacement of damaged sections of kerb and gutters and reconstruction of road pavement. Length = 140 m; Width = 6.6 m; Area = 924 m2.
Total cost of proposed project is $286,575 |
Disclaimer: The material contained in this site is made available
on the understanding that the Department is not thereby engaged in rendering professional
advice for a particular purpose. Before relying on the material in any important
matter, users should carefully evaluate the accuracy, completeness and relevance
of the information for their purposes and should obtain appropriate professional
advice relevant to their particular circumstances.
Project details last updated: 10/08/2017