Funding Program: | Roads to Recovery Program |
Status: | Completed |
Transport Mode: | Road |
Expected Start/Finish: | Nov 2015 - Jan 2016 |
Australian Government Contribution: | $160,133 |
Local Council/Shire: | Parramatta City Council |
State: | NSW |
Project DescriptionThe road surface is affected by pavement failures and cracks. The surface is old and rough due to multiple patches and disintegration of existing asphalt surface.
The proposed work includes repair of kerb and gutters, repair of pavement failures and resurfacing of the road with asphalt. Length = 315 m; Width = 8.2 m; Area = 2583 m2.
Total cost of proposed project is $177,701 |
Disclaimer: The material contained in this site is made available
on the understanding that the Department is not thereby engaged in rendering professional
advice for a particular purpose. Before relying on the material in any important
matter, users should carefully evaluate the accuracy, completeness and relevance
of the information for their purposes and should obtain appropriate professional
advice relevant to their particular circumstances.
Project details last updated: 10/07/2016