Funding Program: | Roads to Recovery Program |
Status: | Completed |
Transport Mode: | Road |
Expected Start/Finish: | Jul 2015 - Mar 2019 |
Australian Government Contribution: | $1,700,000 |
Local Council/Shire: | South Australian Local Government Grants Commission |
State: | SA |
Project DescriptionThe current road has problems with its current configuration. This includes wide traffic lanes of 7 metres with no physical delineation which leads to cars overtakng each other along the road, poor road lighting, limited drainage infrastructure resulting in traffic hazards associated with local flooding, high number of pavement defects resulting in a high level of surface roughness
Upgrade of 0.775 kilometres of Peachey Road which consists of resconstruction of the existing road, upgrade of road lighting to category V5, provision of kerb protuberances, on street parking and pavement marking. New kerbing will be provided to improve drainage, in addition to improvement of the stormwater system to cater for road runoff. Construction of new wider footpaths on either side of peachey Road and landscaping of road verges and medians.
Total cost of proposed project is $7,000,000 |
Disclaimer: The material contained in this site is made available
on the understanding that the Department is not thereby engaged in rendering professional
advice for a particular purpose. Before relying on the material in any important
matter, users should carefully evaluate the accuracy, completeness and relevance
of the information for their purposes and should obtain appropriate professional
advice relevant to their particular circumstances.
Project details last updated: 10/04/2019