Funding Program: | Roads to Recovery Program |
Status: | Completed |
Transport Mode: | Road |
Expected Start/Finish: | Aug 2015 - Nov 2015 |
Australian Government Contribution: | $301,143 |
Local Council/Shire: | Shire of Dowerin |
State: | WA |
Project Description4 metre bitumen seal is breaking up and very potholed in numerous sections. The road is not wide enough for heavy vehicle traffic.
Widen running surface to 10m with a reconstructed 7.2m two coat bitumen seal. In August 2015 we will be carrying out the pruning works of vegetation to enable us to widen that section of road as it is very over grown. Then in September 2015 we will be commencing the drainage works required, and then commencing the integration of lime into the base course,gravel overlay, wet mixing, cement stabilisation and bitumen seal finishing by the middle of November 2015. |
Disclaimer: The material contained in this site is made available
on the understanding that the Department is not thereby engaged in rendering professional
advice for a particular purpose. Before relying on the material in any important
matter, users should carefully evaluate the accuracy, completeness and relevance
of the information for their purposes and should obtain appropriate professional
advice relevant to their particular circumstances.
Project details last updated: 10/08/2016