Funding Program: | Roads to Recovery Program |
Status: | Completed |
Transport Mode: | Road |
Expected Start/Finish: | Aug 2015 - Jul 2017 |
Australian Government Contribution: | $100,000 |
Local Council/Shire: | Shire of Manjimup |
State: | WA |
Project DescriptionThe existing road width of 4.0 metres is substandard. The existing vertical and horizontal geometry are substandard.
Design and construct road with compliant horizontal and vertical geometry with a 6 metre wide sealed pavement and 1 metre wide shoulder each side. Extend and or replace existing culverts as appropriate.
Total cost of proposed project is $434,070 |
Disclaimer: The material contained in this site is made available
on the understanding that the Department is not thereby engaged in rendering professional
advice for a particular purpose. Before relying on the material in any important
matter, users should carefully evaluate the accuracy, completeness and relevance
of the information for their purposes and should obtain appropriate professional
advice relevant to their particular circumstances.
Project details last updated: 10/10/2017