Project DescriptionThis section of road is suffering from bad pavement failure, cracking and drainage issues
A full reconstruction to be carried out including vertical and horizontal alignment improvements. Existing pavement is to be rehabilitated and stabilized to existing formation width. Then a 150mm base layer of selected road base and seal will be applied. Kerb and guttering and major drainage improvements will also be undertaken |
Disclaimer: The material contained in this site is made available
on the understanding that the Department is not thereby engaged in rendering professional
advice for a particular purpose. Before relying on the material in any important
matter, users should carefully evaluate the accuracy, completeness and relevance
of the information for their purposes and should obtain appropriate professional
advice relevant to their particular circumstances.
Project details last updated: 10/11/2015