Funding Program: | Roads to Recovery Program |
Status: | Completed |
Transport Mode: | Road |
Expected Start/Finish: | Aug 2015 - Sep 2015 |
Australian Government Contribution: | $33,600 |
Local Council/Shire: | Shire of Merredin |
State: | WA |
Project DescriptionThe road has multiple sub-surface failures with natural clay coming through the road surface and roadside drainage requires re-establishing.
Gravel sheet to a width of 10 metres and a depth of 150 millimetres and re-establish roadside drainage .
Total cost of proposed project is $34,400 |
Disclaimer: The material contained in this site is made available
on the understanding that the Department is not thereby engaged in rendering professional
advice for a particular purpose. Before relying on the material in any important
matter, users should carefully evaluate the accuracy, completeness and relevance
of the information for their purposes and should obtain appropriate professional
advice relevant to their particular circumstances.
Project details last updated: 10/02/2016