Funding Program: | Roads to Recovery Program |
Status: | Completed |
Transport Mode: | Road |
Expected Start/Finish: | Jul 2015 - Mar 2016 |
Australian Government Contribution: | $579,793 |
Local Council/Shire: | Shire of Cue |
State: | WA |
Project DescriptionThe road is currently various widths, has some tight radius curves and is flat and below the natural ground level in parts. The sheeting materials are worn away and there is a lack of surface drainage.
Re-align the tight radius curves, install surface drainage, reform the road to be above the natural ground level, gravel sheet the road to have a uniform 9 metre running surface with a 4% crowned cross fall. Install guide posts etc |
Disclaimer: The material contained in this site is made available
on the understanding that the Department is not thereby engaged in rendering professional
advice for a particular purpose. Before relying on the material in any important
matter, users should carefully evaluate the accuracy, completeness and relevance
of the information for their purposes and should obtain appropriate professional
advice relevant to their particular circumstances.
Project details last updated: 10/04/2016