Funding Program: | Roads to Recovery Program |
Status: | Completed |
Transport Mode: | Road |
Expected Start/Finish: | Oct 2015 - Jun 2016 |
Australian Government Contribution: | $180,089 |
Local Council/Shire: | District Council of Mallala |
State: | SA |
Project DescriptionProblems being addressed are stormwater pooling issues and failing surface/pavement. The stormwater issues are located in front of business premises and the existing surface/pavement surface is undulating and rough to drive on at township speeds.
Propose kerb and water table installation to fix stormwater pooling issues and resurface existing pavement with a hotmix correction course to fix the undulating rough surface.
Total cost of proposed project is $234,000 |
Disclaimer: The material contained in this site is made available
on the understanding that the Department is not thereby engaged in rendering professional
advice for a particular purpose. Before relying on the material in any important
matter, users should carefully evaluate the accuracy, completeness and relevance
of the information for their purposes and should obtain appropriate professional
advice relevant to their particular circumstances.
Project details last updated: 10/08/2016