Funding Program: | Roads to Recovery Program |
Status: | Completed |
Transport Mode: | Road |
Expected Start/Finish: | May 2016 - Sep 2016 |
Australian Government Contribution: | $100,206 |
Local Council/Shire: | Campaspe Shire Council |
State: | VIC |
Project DescriptionComponents of the bridge have been listed as failed or are failing under the adopted service level, being a missing timber pile, north east wing wall to be made sound and the timber wing wall panel to be replaced.
The bridge crosses a natural water course and has a total span of 16.8m in length by 5.2m width.
To reinstate the bridge components, replace the missing pile to prolong the life of the structure. Install delineation markers to enable clear sightlines to road users for all weather conditions. |
Disclaimer: The material contained in this site is made available
on the understanding that the Department is not thereby engaged in rendering professional
advice for a particular purpose. Before relying on the material in any important
matter, users should carefully evaluate the accuracy, completeness and relevance
of the information for their purposes and should obtain appropriate professional
advice relevant to their particular circumstances.
Project details last updated: 10/02/2017