Funding Program: | Roads to Recovery Program |
Status: | Completed |
Transport Mode: | Road |
Expected Start/Finish: | Nov 2015 - Feb 2016 |
Australian Government Contribution: | $179,194 |
Local Council/Shire: | Town of Claremont |
State: | WA |
Project DescriptionFollowing 2012 assessment by Opus the road network was prioritised based on asphalt condition, cracking, patches, local surface defects, rutting and traffic counts. The list of roads were then inspected for deterioration since the survey. cost of annual maintenance and drainage problems.
This road has potholes, edge failure, displaced kerb and cracking
Remove 40mm of seal, replace with new asphalt layer and new kerbing |
Disclaimer: The material contained in this site is made available
on the understanding that the Department is not thereby engaged in rendering professional
advice for a particular purpose. Before relying on the material in any important
matter, users should carefully evaluate the accuracy, completeness and relevance
of the information for their purposes and should obtain appropriate professional
advice relevant to their particular circumstances.
Project details last updated: 10/08/2016