Funding Program: | Roads to Recovery Program |
Status: | Completed |
Transport Mode: | Road |
Expected Start/Finish: | Feb 2018 - Jun 2018 |
Australian Government Contribution: | $255,060 |
Local Council/Shire: | Shire of Northampton |
State: | WA |
Project DescriptionRoad surface is bitumen and needs resealing. the bitumen surface is undulating, cracking and pot holes occur frequently due to the age of the bitumen surface. In addition the west side of road requires installation of kerb to channel drainage off road into storm water drainage system. At present west side has a grass verge that prevents water run off into the underground drainage system
Resurface 7m road surface with a slurry seal, install kerb to west side of road and backfill
Total cost of proposed project is $272,780 |
Disclaimer: The material contained in this site is made available
on the understanding that the Department is not thereby engaged in rendering professional
advice for a particular purpose. Before relying on the material in any important
matter, users should carefully evaluate the accuracy, completeness and relevance
of the information for their purposes and should obtain appropriate professional
advice relevant to their particular circumstances.
Project details last updated: 10/08/2018