Department of Infrastructure, Transport, Cities and Regional Development print logo Building our Future print logo

Search for a project or place

267 results match all words.
41.Project Name: Fitzgerald Road (Rural Road) - 110048-20SA-RTR
Project category: Road
Funding program: Roads to Recovery Program
Project status: In planning
Description: Slippery surface when wet due to worn surface To re-sheet 2.5 km using crushed limestone rubble and drainage works as required.
 
42.Project Name: Pinkawillinie Road (rural road) - 110051-20SA-RTR
Project category: Road
Funding program: Roads to Recovery Program
Project status: In planning
Description: Surface has become rough and slippery when wet. To re-sheet 2 kilometres of road surface using crushed limestone rubble. Improve side drains.
 
43.Project Name: Sheringa Beach Road (Rural Road) - 107646-20SA-RTR
Project category: Road
Funding program: Roads to Recovery Program
Project status: Completed
Description: Road showing complete loss of sheeting in sections, poor formation and drainage issues, scour of natural surface and rutting. Resheeting of section of road
 
44.Project Name: Vandeleur Road, Tarlee - 108700-20SA-RTR
Project category: Road
Funding program: Roads to Recovery Program
Project status: In planning
Description: The road surface is in poor condition The road will be formed and re sheeted Total cost of proposed project is $105,232
 
45.Project Name: North West Terrace, Brownlow KI - 111000-20SA-RTR
Project category: Road
Funding program: Roads to Recovery Program
Project status: Under construction
Description: Gravel Road has limited Rubble thickness quality, is dusty in summer with a rough surface. Resheet Road with crushed Limestone rubble to 7m wide
 
46.Project Name: The Parade, Brownlow KI - 111008-20SA-RTR
Project category: Road
Funding program: Roads to Recovery Program
Project status: Under construction
Description: Road has poor quality rubble with insufficient depth causing dust in summer and water ponding in winter Resheet road with crushed Limestone to 7m wide
 
47.Project Name: Barrier Highway - north of Riverton - RIVERTON - 106462-20SA-BS
Project category: Road
Funding program: Black Spot Projects
Project status: Under construction
Description: Widen sealed shoulders at curves and install safety barriers, delineation improvements to include Retro-reflective Raised Pavement Markers (RRPM) and install Audio Tactile Line Markings (ATLM)
 
48.Project Name: Taratap Road, Kingston SE - 108408-20SA-RTR
Project category: Road
Funding program: Roads to Recovery Program
Project status: In planning
Description: Reseal of existing pavement to address cracking and brittle surface Reseal segments 3, 4 and 5 (total of 4.862km) with single coat seal 7mm (C170)
 
49.Project Name: Thuruna Road - Rural Road - 108448-20SA-RTR
Project category: Road
Funding program: Roads to Recovery Program
Project status: Completed
Description: 6.1km of unsealed road in need of resurfacing due to normal wear over time Resheet 6.1km of open surface road to upgrade surface
 
50.Project Name: Leonard Road, Hahndorf - 109462-20SA-RTR
Project category: Road
Funding program: Roads to Recovery Program
Project status: In planning
Description: Road pavement has deteriorated beyond routine maintenance and needs full replacement Reconstruction the road pavement and new wearing course to provide safe access residential traffic.