Department of Infrastructure, Transport, Cities and Regional Development print logo Building our Future print logo

Bridges Renewal Program and Heavy Vehicle Safety and Productivity Program - Resources

The Bridges Renewal Program (BRP) and the Heavy Vehicle Safety and Productivity Program (HVSPP) are complementary programs designed to provide funding to State, Territory and Local Governments for projects which will:

  • upgrade and replace bridges to enhance access for local communities and facilitate higher productivity vehicle access (BRP) and;
  • increase the productivity and safety of heavy vehicle operations (HVSPP).

All mandatory and important documentation for both programs are below.

Guidelines

  • Guidelines for Applicants DOCX: 191 KB – The Guidelines for Applicants outline the application process for the programs and contain the mandatory requirements for an application.
  • Guidelines for Successful Funding Recipients DOCX: 190 KB – The Guidelines for Successful Funding Recipients support proponents. They outline the obligations that proponents must follow in their management of the project.

Application Form

  • Application Form XLSX: 207 KB – The Application Form is mandatory for all applications. It is used by applicants to provide information about each project.

Applications must be emailed to the program mailbox, including all attachments:

Funded projects

  • Request for Tender Exemption Form DOCX: 124 KB – The Request for Tender Exemption form is mandatory when a proponent is seeking an exemption from tendering works greater than $100,000. The form also explains when exemptions may not be required.
  • Milestone Claim Form DOCX: 121 KB – The Milestone Claim Form is mandatory for proponents to claim a milestone payment. The completed form, along with supporting evidence should be sent to the relevant State/Territory transport department (if required by them) or directly to the department at the contact details provided below.
  • Project Variation Request DOCX: 120 KB – The Project Variation Request form is mandatory if the scope, cost or schedule of an approved project is changing.
  • Project Withdrawal Request DOCX: 115 KB – The Project Withdrawal Request form is mandatory when a proponent wants to withdraw a funded project.

Reporting

  • Monthly Report Template XLSM: 140 KB – State and Territory transport departments report on the status of funded projects each month. Where updates aren’t provided, this Monthly Report Template can be used to provide updates on funded projects.
  • Post Completion Report DOCX: 115 KB – The Post Completion Report provides a summary of key features of the project. It is mandatory and must be submitted with the Claim for Payment of the Final Milestone. The Final Milestone will not be paid until the Department accepts the Post-Completion Report.

Contact us

If you have questions in relation to the programs or any of the above resources, please contact us by email: