Skip to main content
  • Contact (Opens in a new tab/window)
Logo image Logo image
  • Home
  • About
    • National Initiatives
      • Major Projects Business Case Fund
      • Remote Roads Upgrade Pilot Program
      • Corridor Packages
    • Local Initiatives
      • Roads to Recovery Program
      • Black Spots Program
      • Heavy Vehicle Safety and Productivity Program
      • Local Roads and Community Infrastructure Program
      • Active Transport Fund
        • Australian Capital Territory Active Transport Fund Projects
        • New South Wales Active Transport Fund Projects
        • Northern Territory Active Transport Fund Projects
        • Queensland Active Transport Fund Projects
        • South Australia Active Transport Fund Projects
        • Tasmania Active Transport Fund Projects
        • Victoria Active Transport Fund Projects
        • Western Australia Active Transport Fund Projects
      • Bridges Renewal Program
      • Safer Local Roads and Infrastructure Program
        • Successful Projects under the Safer Local Roads and Infrastructure Program - Tranche 1
        • Successful Projects under the Safer Local Roads and Infrastructure Program - Tranche 2
        • Successful Projects under the Safer Local Roads and Infrastructure Program - Tranche 3
        • Successful Projects under the Safer Local Roads and Infrastructure Program - Tranche 4
        • Table: Funded projects – Heavy Vehicle Rest Area Tranche 3
    • Budget Announcements
      • Infrastructure Investment Program Strategic Review
    • 2024-25 MYEFO
  • Projects
    • Bruce Highway
    • Projects near me (Opens in a new tab/window)
    • Melbourne to Brisbane Inland Rail
    • Moorebank Intermodal Terminal Precinct
    • Northern Australia Roads Program and Northern Australia Beef Roads Program
    • Outback Way
    • Sydney Metro—Western Sydney Airport
    • Western Sydney Infrastructure Plan
  • Resources for funding recipients
    • Federation Funding Agreement Schedule
      • Project templates
    • The National Land Transport Network
    • Indigenous Employment and Supplier-use Infrastructure Framework
    • Innovative funding and financing
    • Cost Estimation Guidance
    • Safer Local Roads and Infrastructure Program - Resources
    • Local Roads and Community Infrastructure Program resources
    • Roads to Recovery Program resources
    • Nominating a Black Spot
      • Site eligibility
      • Black Spots Program - Frequently Asked Questions
    • Active Transport Fund - Resources
    • Signage Guidelines
  • Contact (Opens in a new tab/window)
Search
  • Home
  • About
  • Projects
  • Resources for funding recipients

Infrastructure Investment Program

The Australian Government is committed to a 10-year, over $120 billion infrastructure investment pipeline, ensuring a rolling program of sustainable land transport infrastructure projects.

The Government is working in partnership with states and territories to deliver a credible and sustainable pipeline of projects which support a range of economic and social objectives, including productivity and resilience, sustainability and liveability.

Search for a place or project
Projects near me

Links

  • RPM Portal (Opens in a new tab/window)
  • Department (Opens in a new tab/window)
  • Ministers (Opens in a new tab/window)
  • australia.gov.au (Opens in a new tab/window)

Utilities

  • Feedback (Opens in a new tab/window)
  • Contact us (Opens in a new tab/window)
  • Disclaimer (Opens in a new tab/window)
  • Privacy (Opens in a new tab/window)

We acknowledge the traditional owners of the Country throughout Australia and their continuing connection to land, sea and community. We pay our respect to them and their cultures and to the Elders past and present.

©2026 Commonwealth of Australia

Return focus to the top of the page

Submissions or registrations of interest to be kept informed about the progress of this work, can be made directly via email to costestimation@infrastructure.gov.au or by using the form below.

Items marked with (required) are mandatory fields.

Maximum 3 files.
Allowed types: txt pdf jpg doc docx ppt pptx xls and xlsx.
The accumulated size of all files in this form cannot exceed 10 MB.

Australian Privacy Principle 5 Notice

Your submission, including any personal information supplied, is being collected by the department for the purpose of seeking public and industry comment on the approach and content of its proposed cost estimation guidance, in accordance with the Privacy Act 1988 (the Privacy Act).

Your personal information will be stored securely by the department. It may be used by the department to make further contact with you about the consultation process. Your personal information will not be disclosed to any other third parties, except in the circumstances outlined below.

Submissions, in part or full, including the name of the author may be published on the department's website or in the Government's response, unless the submission is confidential. Confidential submissions (including author name) will not be published. Private addresses and contact details will not be published or disclosed to any third parties unless required by law.

Submissions will only be treated as confidential if they are expressly stated to be confidential. Automatically generated confidentiality statements or disclaimers appended to an email do not suffice for this purpose. If you wish you make a confidential submission, you should indicate this by ensuring your submission is marked confidential.

Confidential submissions will be kept securely and will only be disclosed in the following circumstances:

  • in response to a request by a Commonwealth Minister;
  • where required by a House or a Committee of the Parliament of the Commonwealth of Australia; or where required by law.

The department may also disclose confidential submissions within the Commonwealth of Australia, including with other Commonwealth agencies, where necessary in the public interest.

Please note that in order to protect the personal privacy of individuals in accordance with the Privacy Act any submissions containing sensitive information, personal information or information which may reasonably be used to identify a person or group of people may not be published, even if not marked as confidential.

The department's privacy policy contains information regarding complaint handling processes and how to access and/or seek correction of personal information held by the department. The Privacy Officer can be contacted on (02) 6274 6495.

Short Street, Rylstone - 113600-20NSW-RTR
Road narrow with scouring in the table drain.Construction of kerb and gutter and widening of the pavement and seal.
Canoona Road, Rockhampton - 113603-20QLD-RTR
The road pavement and seal has reach its end of useful life. Plus the road is narrow.To replace the existing subbase and basecourse layers with new material and seal the road.Total cost of proposed project is $660,000
Eltham Street, Gladesville NSW 2111 - 113602-20NSW-RTR
Eltham Street pavement has extensive failure to approximately 60% of the area. Kerb and gutter has failed for approximately 30% of the length. Pavement length is 280m and average width is 10.8m.Rehabilitation of the pavement by heavy patching, profiling and resurfacing. Replacement of failed kerb and gutter. Adjustment of pavers to match new kerb level.Total cost of proposed project is $501,570
Carbine Street, Donvale - 113520-20VIC-RTR
Fatigued pavement, severe cracking and severe ruttingMajor patching and renewal of asphalt surface.Total cost of proposed project is $195,065
Nyora St Helier Rd, Woodleigh (Rural Road) - 113422-20VIC-RTR
The Pavement had shape loss with multiple patches, the seal was oxidised and starting to crack.Extensive asphalt patching and bituminous re-seal.Total cost of proposed project is $232,000
Dingadee Road (Rural Road) - 113599-20QLD-RTR
The existing road pavement is a gravel road which has loss significant amount of gravel due to the age of the road since last resheeted. Resheeting is required to maintain the condition of the road so vehicles can pass in wet weather conditions without becoming bogged.Gravel Resheeting
Whitewood Road (Rural Road) - 113609-20NSW-RTR
Rough surface creating traffic hazard and insufficient pavement width to allow for safe turning movements.Rehabilitate pavement surface and increase pavement width to to allow through traffic to pass vehicles turning right onto Peachville Road.
Bombah Point Road, Bombah Point - 113563-20NSW-RTR
Existing unsealed gravel road has increased wear and tear due to increasing traffic volumes. This is causing a high risk to road users along with high maintenance cost and increased road user costsProvision of new road pavement with a bitumen wearing surface and improved drainage
Ferme Street, Port Pirie - 113615-20SA-RTR
Failure of sealed surface and pavemenetRoad segment to be profiled (full width) to a depth of 50mm, rehabilitation of pavement, construct with new asphalt
Ferme Street, Port Pirie - 113614-20SA-RTR
Failure of sealed surface and pavementRoad segment to be profiled (full width) to a depth of 50mm, rehabilitation of pavement, construct with asphalt

Pagination

  • « First
  • ‹ Previous
  • 1412
  • 1413
  • 1414
  • 1415
  • 1416
  • 1417
  • 1418
  • 1419
  • 1420
  • Next ›
  • Last »

There are no matches for your search