Skip to main content
  • Contact (Opens in a new tab/window)
Logo image Logo image
  • Home
  • About
    • National Initiatives
      • Major Projects Business Case Fund
      • Corridor Packages
    • Local Initiatives
      • Roads to Recovery Program
      • Black Spots Program
      • Heavy Vehicle Safety and Productivity Program
      • Local Roads and Community Infrastructure Program
      • Active Transport Fund
        • Successful Projects under the Active Transport Fund - Tranche 1
      • Bridges Renewal Program
      • Safer Local Roads Infrastructure Program
        • Successful Projects under the Safer Local Roads Infrastructure Program - Tranche 1
        • Successful Projects under the Safer Local Roads Infrastructure Program - Tranche 2
        • Successful Projects under the Safer Local Roads Infrastructure Program - Tranche 3
        • Successful Projects under the Safer Local Roads Infrastructure Program - Tranche 4
        • Table: Funded projects – Heavy Vehicle Rest Area Tranche 3
    • 2024-25 MYEFO
    • 2026-27 Budget announcements
    • Budget 2024-25 announcements
    • Infrastructure Investment Program Strategic Review
    • Road safety
  • Projects
    • Bruce Highway
    • Projects near me (Opens in a new tab/window)
    • Melbourne to Brisbane Inland Rail
    • Moorebank Intermodal Terminal Precinct
    • Northern Australia Roads Program and Northern Australia Beef Roads Program
    • Outback Way
    • Sydney Metro—Western Sydney Airport
    • Western Sydney Infrastructure Plan
  • Resources for funding recipients
    • Federation Funding Agreement Schedule
      • Project templates
    • The National Land Transport Network
    • Indigenous Employment and Supplier-use Infrastructure Framework
    • Innovative funding and financing
    • Cost Estimation Guidance
    • Safer Local Roads Infrastructure Program - Resources
    • Local Roads and Community Infrastructure Program resources
    • Roads to Recovery Program resources
    • Nominating a Black Spot
      • Site eligibility
      • Black Spots Program - Frequently Asked Questions
    • Active Transport Fund - Resources
    • Signage Guidelines
  • Contact (Opens in a new tab/window)
Search
  • Home
  • About
  • Projects
  • Resources for funding recipients

Infrastructure Investment Program

The Australian Government is committed to a 10-year, over $120 billion infrastructure investment pipeline, ensuring a rolling program of sustainable land transport infrastructure projects.

The Government is working in partnership with states and territories to deliver a credible and sustainable pipeline of projects which support a range of economic and social objectives, including productivity and resilience, sustainability and liveability.

Search for a place or project
Projects near me

Links

  • RPM Portal (Opens in a new tab/window)
  • Department (Opens in a new tab/window)
  • Ministers (Opens in a new tab/window)
  • australia.gov.au (Opens in a new tab/window)

Utilities

  • Feedback (Opens in a new tab/window)
  • Contact us (Opens in a new tab/window)
  • Disclaimer (Opens in a new tab/window)
  • Privacy (Opens in a new tab/window)

We acknowledge the traditional owners of the Country throughout Australia and their continuing connection to land, sea and community. We pay our respect to them and their cultures and to the Elders past and present.

©2026 Commonwealth of Australia

Return focus to the top of the page

Submissions or registrations of interest to be kept informed about the progress of this work, can be made directly via email to costestimation@infrastructure.gov.au or by using the form below.

Items marked with (required) are mandatory fields.

Maximum 3 files.
Allowed types: txt pdf jpg doc docx ppt pptx xls and xlsx.
The accumulated size of all files in this form cannot exceed 10 MB.

Australian Privacy Principle 5 Notice

Your submission, including any personal information supplied, is being collected by the department for the purpose of seeking public and industry comment on the approach and content of its proposed cost estimation guidance, in accordance with the Privacy Act 1988 (the Privacy Act).

Your personal information will be stored securely by the department. It may be used by the department to make further contact with you about the consultation process. Your personal information will not be disclosed to any other third parties, except in the circumstances outlined below.

Submissions, in part or full, including the name of the author may be published on the department's website or in the Government's response, unless the submission is confidential. Confidential submissions (including author name) will not be published. Private addresses and contact details will not be published or disclosed to any third parties unless required by law.

Submissions will only be treated as confidential if they are expressly stated to be confidential. Automatically generated confidentiality statements or disclaimers appended to an email do not suffice for this purpose. If you wish you make a confidential submission, you should indicate this by ensuring your submission is marked confidential.

Confidential submissions will be kept securely and will only be disclosed in the following circumstances:

  • in response to a request by a Commonwealth Minister;
  • where required by a House or a Committee of the Parliament of the Commonwealth of Australia; or where required by law.

The department may also disclose confidential submissions within the Commonwealth of Australia, including with other Commonwealth agencies, where necessary in the public interest.

Please note that in order to protect the personal privacy of individuals in accordance with the Privacy Act any submissions containing sensitive information, personal information or information which may reasonably be used to identify a person or group of people may not be published, even if not marked as confidential.

The department's privacy policy contains information regarding complaint handling processes and how to access and/or seek correction of personal information held by the department. The Privacy Officer can be contacted on (02) 6274 6495.

Bray Street At access to commercial complex COFFS HARBOUR - 100329-19NSW-BS
Install protected right turn lane, S-lane, and painted channelisation, install street lighting at intersection
Grabben Gullen Road - from Anderson Road - CROOKWELL - 100328-19NSW-BS
Mark barrier line, mark road edge lines, install curve alignment markers (CAMs), improve sealed shoulder up to 2.5m on curve, install 2-4m incremental traversable clearzone, install W-beam barrier on roadside
Moore Street - Parkes Street - OAK FLATS - 100327-19NSW-BS
Install single lane roundabout, including all traffic calming, line marking, lighting and signage
Magnus Street - Donald Street - NELSON BAY - 100326-19NSW-BS
Move stop or give-way lines forward using kerb extensions. Install raised islands with new stop signs, upgrade intersection from give-way to stop, remove sight distance restrictions, mark road edge lines, new curve and advisory speed signs, and RRPMs
Lemon Tree Passage Road - at Rookes Road - SALT ASH - 100325-19NSW-BS
Install shoulder from no shoulder/unsealed to >1m sealed on straight. Improve sealed shoulder up to 2.5m on curve. Install 0.5-2m incremental traversable clear zone. Install rural gateway treatment (high to low speed transition). Install Escholtz ker
Abundance Road - from Ferodale Road to Lisadell Road - MEDOWIE - 100324-19NSW-BS
Reduce speed limit, move stop/give-way lines with kerb extensions, upgrade intersection from Give-Way to Stop, separate through and parking lane with painted line, install shoulder to 0.5-1m sealed on straight, install street lighting at mid-block
Masonite Road - south of Waterboard access area - TOMAGO - 100323-19NSW-BS
Reduce speed limit by 20 km/h, install audio-tactile centre line and edge line, and w-beam barrier on roadside, improve sealed shoulder up to 2.5m on curve, install shoulder from no shoulder/unsealed to >1m sealed on straight, improve superelevation
Ramsay Street - St Davids Road and Kingston Street - HABERFIELD - 100322-19NSW-BS
Install slow point, raised threshold / horizontal deviation at mid-block location and conflict points (intersections and pedestrian crossings)
Hillcrest Avenue - near Panorama Street - OATLEY - 100321-19NSW-BS
Upgrade seal to high level non-skid surface, install profile (audio-tactile) edge line
Main Arm Road - Settlement Road - MAIN ARM - 100320-19NSW-BS
Install guideposts, w-beam barrier on roadside, RRPMs, CAMs, signage, mark barrier and road edge lines, remove sight distance restrictions at intersection, reseal with non-skid surface, seal shoulder up to 2.5m on curve, and improve superelevation.

Pagination

  • « First
  • ‹ Previous
  • 1941
  • 1942
  • 1943
  • 1944
  • 1945
  • 1946
  • 1947
  • 1948
  • 1949
  • Next ›
  • Last »

There are no matches for your search