| State | Tranche | Proponent | Project Name | Project Summary | Australian Government Contribution ($) | Total Project Cost ($) |
|---|---|---|---|---|---|---|
| SA | Tranche 1 | SA, Department For Infrastructure and Transport | Salt Creek Rest Area | The project will create a heavy vehicle Rest areas for the largest vehicle currently permitted on Princes Highway (PBS Level 3B). The project will include five parking bays, a unisex toilet block, installation of metal shade structure and picnic tables. | $3,040,000 | $3,800,000 |
| VIC | Tranche 1 | Department of Transport and Planning | HVRA - Construction of Truck Informal Rest Area Improvements (TIRA), on various highways within Gippsland | The project will deliver improvements to up to 35 Truck Informal Rest Areas (TIRA’s) on the Bass Highway, South Gippsland Highway, Strzelecki Highway and Hyland Highway within Gippsland. | $2,168,000 | $2,710,000 |
| QLD | Tranche 1 | Maranoa Regional Council | Upgrade rest area facility at the eastern approach to Roma on the Warrego Highway | The project will upgrade an existing rest area to provide a combined facility for motorists and heavy vehicles. The project includes strengthening and sealing the accesses and parking arrangement, including a defined separation from the Warrego Highway, upgraded signage, provide landscaping treatments to improve aesthetics and manage stormwater runoff. | $1,120,000 | $1,900,000 |
| TAS | Tranche 1 | Brighton Council | Construction of truck stop upgrade on Glenstone Road/ Strong Street, Bridgewater | The project will upgrade the existing heavy vehicle rest area on Glenstone Road, Bridgewater, as per the Concept Plan, prepared by Play Street Landscape Architects. | $360,000 | $450,000 |
| SA | Tranche 2 | SA, Department for Infrastructure and Transport | SA, Department for Infrastructure and Transport – Design, Upgrade and Construct Rest Area on Barrier Highway, MM125.4: WINNININNIE, MM32.2: BINDARRAH | This project will upgrade an existing informal rest area and construct a new heavy vehicle rest area at two locations on the Barrier Highway in South Australia. Both rest areas will include metal shelters and picnic areas, and include space for up to four PBS level 3A vehicles. | $1,696,800 | $2,121,000 |
| NSW | Tranche 2 | TRANSPORT FOR NSW | Transport for NSW – northbound Upgrade Tycannah Rest Stop NB on Newell Highway, Moree | The project will upgrade the existing light vehicle minor rest area to cater for heavy vehicles, providing a place for truck drivers to rest. The project will include a deceleration access lane, expanded parking for nose to tail heavy vehicle parking, separated parking for light vehicles and toilets. | $4,800,000 | $6,000,000 |
| NSW | Tranche 2 | TRANSPORT FOR NSW | Transport for NSW – Upgrade of southbound Tycannah Rest Stop SB on Newell Highway, Moree | The project will upgrade the southbound Tycannah rest area at Moree. The project will include 5 additional parking bays, separated light vehicle parking, a male and female accessible toilet block and deceleration lanes to improve access safety. The upgraded rest area will cater for all vehicles and provide a Class 3 rest facility for heavy vehicles. | $4,800,000 | $6,000,000 |
| NSW | Tranche 2 | Hay Shire Council | Hay Shire council - Design and Construction of Heavy Vehicle Rest Area on the Sturt Highway, Hay | The project involves design and construction of the Hay Heavy Vehicle Rest Area on the Sturt Highway in Hay. The project will include the design and construction of a 200m x 70m Heavy Vehicle Rest Area, building of dedicated slip and turning lanes off the Sturt and Cobb Highways, creation of a truck parking area with protection for existing services, and adding shelters, landscaping, and connecting footpaths. | $2,711,436 | $3,389,295 |
| WA | Tranche 2 | Shire of Pingelly | Shire of Pingelly – Design and Upgrade Light Vehicle Rest Area to Heavy Vehicle Rest Area, Pingelly | The project will create a formal class 3/4 heavy vehicle rest area where there is currently an informal strip of land and light vehicle rest area. The project will formalise the site by including heavy vehicle parking bays, all weather pavement, drainage, solar lighting, seating and shade, amenities and fencing. | $285,416 | $356,770 |
| NT | Tranche 3 | Northern Territory of Australia | Northern Territory of Australia -Buntine Highway - Upgrade 5 Heavy Vehicles Rest Areas from unsealed to sealed standard | This nominated project is to seal 5 unsealed Heavy Vehicles Rest Areas on Buntine Highway to sealed standards. These areas are adjacent to sealed sections of the Buntine Highway located at 16.6, 44.0, 60.7, 204.2 and 257.4 km, where 0.0 kilometre is at the intersection with the Victoria Highway. The two rest areas at 16.6 and 204.2 km are adjacent to a two lane sealed section of the Buntine Highway. The 3 rest areas at 44.0, 60.7 and 257.4 km are adjacent to 4m to 5m wide single sealed lane that will require widening to provide a safe turning for the heavy vehicles. | $4,000,000 | $5,000,000 |
| WA | Tranche 3 | Shire of Mukinbudin | Shire of Mukinbudin - Mukinbudin Heavy Vehicle Rest Area | Construction of ablution block and picnic area for use by heavy vehicle operators. | $66,400 | $83,000 |
| NSW | Tranche 3 | Bourke Shire Council | Bourke Shire council - Construct Heavy Vehicle Rest Area On The Bourke To Milparinka Road At Goonary | The project is to construct an informal sealed pavement Heavy Vehicle Rest Area. The construction will be on the Road Reserve at Goonary on the north side of the carriageway and include gravel pavement and bitumen seal. | $67,200 | $84,000 |
| WA | Tranche 3 | Shire of Coolgardie | Shire of Coolgardie - Asphalt surfacing of Rd train/truck stop area at intersection of Bayley St/Great Eastern Hwy and Ladyloch Road in Coolgardie | The project will see the application of a 40mm thick MRWA specification asphalt surfacing to the existing road train / truck stop area covering an area of 18,900m2 including the access crossover from Ladyloch Road. The project also includes application of pavement and line marking to designate areas for movements and parking of road trains and trucks. | $792,000 | $990,000 |
| NSW | Tranche 3 | Walcha Council | Walcha council - Pindari Tops Rest Area | Construction of a rest area on Thunderbolts Way 49kms south of Walcha | $240,000 | $300,000 |
| NSW | Tranche 3 | Wollondilly Shire Council | Wollondilly Shire council - Ted “Greendog” Stevens Truck Parking Bay Renewal | The project will upgrade the heavy vehicle rest area located on Remembrance Driveway, Razorback, NSW, 2571. The project area is 2550.91m2. The project will include design work,then resurfacing of the area with 200mm thick Asphaltic Concrete pavement (i.e. 140mm DG28 and 60mm DG14, R116 spec). A new shelter will also be installed with aluminium tables and chairs. | $314,160 | $392,700 |
| NSW | Tranche 4 | TRANSPORT FOR NSW | Transport for NSW – Upgrade to Ravensworth Eastbound & Westbound rest areas on Sturt Hwy, Maude | The project will upgrade the existing rest areas including provision of additional security/safety lighting and additional composting toilets. | $500,000 | $1,000,000 |
| SA | Tranche 4 | SA, Department for Infrastructure and Transport | SA, Department for Infrastructure and Transport - Stuart Highway Rest Area Upgrade (Arcoona & Pimba) | This project will upgrade the existing rest area at Arcoona and establish a new rest area at Pimba. | $2,125,000 | $4,250,000 |
| QLD | Tranche 4 | Queensland Department of Transport and Main Roads | Queensland Department of Transport and Main Roads – Design and construction of a new HVRA at Homestead West on Flinders Highway, at Chainage 75.6km | The project will see the design and construction of a new heavy vehicle rest area at Homestead West on Flinders Highway, at Chainage 75.6km. | $4,300,000 | $8,600,000 |
| QLD | Tranche 4 | Maranoa Regional Council | Maranoa Regional council – Asphalt surfacing of heavy vehicle truck stop area at the Roma Truck Stop precinct | The project will upgrade an existing gravel surface to an asphalt surface at the existing heavy vehicle parking area covering an area of 21,500m2. The project also includes application of line marking to designate areas for movements and parking of heavy vehicles. | $1,600,000 | $2,000,000 |
| NSW | Tranche 4 | Narromine Shire Council | Narromine Shire council - Design and Upgrade of Tomingley Heavy Vehicle Rest Area, Tomingley | This project is to upgrade an existing heavy vehicle rest area (currently Informal) including kerb & gutter installation, pavement & sealing (approx. 10,000 m²), drainage, landscaping, linemarking & signage (including along the Newell Highway) and providing new amenities for users. In addition to the above the project would also include the installation of pedestrian crossing facilities over the Newell highway to the nearby service station. | $1,233,600 | $1,542,000 |
| VIC | Tranche 4 | Yarriambiack Shire Council | Yarriambiack Shire council - Upgrade nine existing truck parking locations in the Yarriambiack Shire | This project will upgrade nine existing truck parking locations in the Yarriambiack Shire. | $32,900 | $47,000 |
| NSW | Tranche 5 | Transport for NSW | TfNSW - Design & upgrade of Kyeamba Rest Area, SB on the Hume Hwy, Kyeamba. | The project will upgrade the southbound Kyeamba rest area at Kyeamba. The project will involve the installation of a toilet block with two unisex and one disabled-accessible toilets, along with two picnic shelters. It will also include parking provisions for both heavy and light vehicles. Additionally, the project will upgrade the pavement, drainage system, curbs and gutters, and install a safety barrier to protect the rest area from potential accidents involving vehicles on the roadway. | $1,218,766 | $2,437,533 |
| VIC | Tranche 5 | Victoria, Department of Transport and Planning | Department of Transport and Planning (Vic) - Nhill Trailer Exchange - Female toilet construction. | The project will construct two female toilets at the existing toilet block at the Nhill Trailer Exchange, Nhill. | $265,000 | $530,000 |
| SA | Tranche 5 | SA, Department for Infrastructure and Transport | SA, Department for Infrastructure and Transport - New rest area on Barrier Highway at Wiawera | The project includes the design and construction of a new rest area on the Barrier Highway at Wiawera. The rest area will provide capacity for up to four Performance Based Standards Scheme (PBS) Level 3A vehicles and amenities that include a shelter, table and seating. | $1,035,000 | $2,070,000 |
| SA | Tranche 5 | SA, Department for Infrastructure and Transport | SA, Department for Infrastructure and Transport - New rest area on Barrier Highway at Black Springs | The project includes the design and construction of a new rest area on the Barrier Highway at Black Springs. The rest area will provide capacity for up to four Performance Based Standards Scheme (PBS) Level 3A vehicles and amenities that include a shelter, table and seating. | $1,120,000 | $2,240,000 |
| WA | Tranche 6 | Commissioner of Main Roads | Commissioner of Main Roads - Construction of Heavy Vehicle Rest Area on Eyre Highway, Mundrabilla | The project will construct a HVRA accommodating 36 vehicles up to 60m length and facilities including toilets, shower, shade shelter and lighting and security systems. | $5,000,000 | $13,000,000 |
| WA | Tranche 6 | Commissioner of Main Roads | Commissioner of Main Roads - Shire of Cranbrook HVRA Expansion | The project will implement the planned expansion of the Cranbrook HVRA from 8 HV bays to 16 HV bays and improve the existing solar power facilities. | $2,095,000 | $4,190,000 |
| WA | Tranche 6 | Shire of Plantagenet | Shire of Plantagenet - Rocky Gully Heavy Vehicle Rest Area Extension | Extension of existing Rocky Gully Heavy Vehicle Rest Area to provide a 150m long parallel, heavy vehicle specific rest area with lighting. | $145,600 | $182,000 |
| WA | Tranche 6 | Shire of Victoria Plains | Shire of Victoria Plains - Calingiri Heavy Vehicle Rest Area | To build a public amenity facility and parking bay for public use within the town of Calingiri. This will be then segregating areas specifically for cars, caravans, etc to use and then a separate area for Heavy Vehicles to safely pull in and access a public facility with toilets and showers. This will be an informal parking bay/rest area. | $256,000 | $320,000 |
| NSW | Tranche 6 | Central Darling Shire Council | Central Darling Shire Council - Design and Upgrade of Halfway Tree Rest Area, Cobb Highway | The project will involve the design, engineering, supply, and installation of new rest area infrastructure at the Halfway Tree site on the Cobb Highway, located between Wilcannia and Ivanhoe. The scope includes the installation of one (1) anti-vandal series CAB1 toilet block with gable roof, complete with solar-powered lighting and a 3000-litre water tank on a steel stand. The installation will also include a chair-table setting to support user comfort and amenity. | $167,380 | $209,225 |
| NSW | Tranche 6 | Narromine Shire Council | Narromine Shire Council - Design and Upgrade of Narromine Heavy Vehicle Rest Area, Narromine | Upgrade and expansion to the existing informal heavy vehicle rest area including construction of a formalised one-way HV parking area (approx. 30 spaces), kerb and gutter, pavement works and sealing (approx. 20,000 m²), drainage infrastructure, line marking, signage and landscaping. Works also include upgrade of existing amenities, improved pedestrian access, and new footpath and crossing connection to the opposite side of the road and broader footpath network. Seating and landscaping for both the travelling public and local users will be provided to enhance amenity. | $2,384,000 | $2,980,000 |