StateApplicantProject NameProject DescriptionAustralian Government Funding AmountTotal Project Cost
NSWBega Valley Shire CouncilBega Valley Shire Council - Boundary Road Bega Intersection Upgrade Stage 3The project involves upgrading the intersection at Boundary Road and Tathra Road in Bega, New South Wales. The primary goal is to enhance safety and functionality by developing an intersection capable of accommodating long vehicles, along with a 2.5m-wide shared path that connects existing infrastructure to the Southeast Regional Hospital.$2,820,046$3,525,046
NSWBourke Shire CouncilBourke Shire Council - North Bourke Bridge reconstruction and pedestrian safety projectThe project will reconstruct the previously demolished, and unsafe, wooden approaches to the North Bourke Bridge, restoring safe pedestrian and cyclist access across the Darling-Baaka River between Bourke and North Bourke, which will be a crossing of approximately 380 metres.$4,405,701$5,507,126
NSWCentral Darling Shire CouncilCentral Darling Shire Council - Ivanhoe-Menindee Road Flood Resilience and Access ImprovementThis project will deliver sealing of an approximately 7 km section of Ivanhoe-Menindee Road. The remaining length of the Ivanhoe-Menindee Rd is not subject to Darling River or Talyawalka Creek flooding events.$5,000,000$6,746,508
NSWEurobodalla Shire CouncilEurobodalla Shire Council - Broulee Road, BROULEE Upgrade The project involves road safety upgrades along an approximate 1,110 metre section of Broulee Road. The scope includes widening and sealing of road shoulders, pavement strengthening and resurfacing, and minor adjustments to horizontal and vertical alignment. The project also includes the upgrade of the quarry access intersection to a Basic Right Turn (BAR) treatment and associated works.$1,552,000$1,940,000
NSWEurobodalla Shire CouncilEurobodalla Shire Council - Carramar Drive, LILLI PILLI, Intersection UpgradeThis project involves targeted road safety upgrades along George Bass Drive (GBD) at the Carramar Drive and Lilli Pilli Drive intersections, including associated road, pedestrian and public transport infrastructure works, within the existing road corridor.$1,232,000$1,540,000
NSWHilltops CouncilHilltops Council - Murringo Gap Road and Chews Lane UpgradeThe Murringo Gap Road and Chews Lane Upgrade Project involves the targeted widening and minor realignment of sections of both roads to address existing safety, access and drainage deficiencies and to improve overall road performance. The project will cover approximately 10 kilometres of Murringo Gap Road and 2 kilometres of Chews Lane, focusing on sections where narrow pavement widths, poor geometry and drainage constraints currently compromise safe vehicle movements. Along Murringo Gap Road, selected sections will be widened from an existing width of approximately 4 metres to 8 metres, while sections of Chews Lane will be widened from 5 metres to 8 metres.$4,783,200$5,979,000
NSWKyogle CouncilKyogle Council - Collins Creek Road Upgrade and Initial seal between Killaloe Road and Collins Valley RoadInitial seal to a missing link of Collins Creek Road up to the local Primary School. Approximately 2.1 km of road will be widened to a consistent 7m width. The upgrade will involve widening, bitumen sprayed seal, pavement strengthening, ride quality improvement, improving drainage, line marking, signage and delineation.$2,891,200$3,614,000
NSWLismore City CouncilLismore City Council - Design and upgrade of Simeoni Drive, GoonellabahCollector Road - Simeoni Drive & Gordon Blair Drive between the Bruxner Highway and Oliver Avenue - Works to include pavement investigations, pavement upgrade (if found unsuitable) for heavy vehicles (approximately 630m), construction of a new roundabout, drainage installation, line marking and pedestrian safety initiatives.$3,541,864$4,427,330
NSWMaitland City CouncilMaitland City Council - Design and Construct Scobies Lane Realignment Stage 2, OakhamptonThe project will realign the existing Scobies Lane to reduce the impact of flooding and isolation for the residents of Oakhampton Heights. Approximately 770m of road will be constructed with a pavement width of 12m. Additionally a 2.5m concrete shared path will be constructed adjacent to the proposed road.$2,556,261$5,112,522
NSWMid-Western Regional CouncilMid-Western Regional Council - Design and Construction of Grattai Creek Bridge on Hill End RoadThe project will replace the existing 135 year old 4.5m wide, 12m long single-lane bridge over Grattai Creek on Hill End Road through the design and construction of a 9m wide, 15m long two-lane bridge.$1,664,000$2,080,000
NSWNarromine Shire CouncilNarromine Shire Council - Construct Widening on Backwater Road, NarromineThe project will widen an approximately 6.16 km section of Backwater Road, west of Narromine. The narrow pavement (currently averaging 4.5 m) will be widened to 7 m on straights and 8 m on curves. Shoulders will be constructed, pavement rehabilitated where required, full-width spray sealing applied, and minor drainage works completed.$1,579,200$1,974,000
NSWNarromine Shire CouncilNarromine Shire Council - Construct Widening on Peak Hill Railway Road, NarromineThe project will widen an approximately 11.1km section of Peak Hill Railway Road. This section will be expanded from its current average width of 3.5 metres to a consistent 7 metres on straight sections and 8 metres on curves. The works will include upgrading drainage structures to accommodate the wider road profile, installing new signage and line marking, managing roadside vegetation, and implementing safety features such as barriers on outer curves where required.$3,680,000$4,600,000
NSWNarromine Shire CouncilNarromine Shire Council - Design & Construct Widening on Enmore Road, TrangieThe project will widen approximately 9.5 km section of Enmore Road, from its intersection with the Mitchell Highway through to the tie-in point with recently widened works to the west. The sealed width will be increased from approximately 3.5 m to 7 m on straights and 8 m on curves. Works will include shoulder widening, pavement strengthening through in-situ stabilisation and overlay, and full-width sealing. Several existing culverts will be upgraded, extended, or replaced. Vegetation clearing, including removal of larger trees, will be undertaken to improve sight distances and accommodate formation widening. Design will address geometric improvements and drainage needs along the curved and constrained alignment.$3,748,000$4,685,000
NSWTamworth Regional CouncilTamworth Regional Council - Construction of Shared Path, Moore Creek Road, North TamworthThis project will address severe safety issues on Moore Creek Road, Tamworth through construction of a parallel shared path between Idyllic Street in the Hills Plain residential development and Johnston Street, North Tamworth. The approximately 2.9km, 3m wide path will separate vulnerable users from high-speed traffic and enable safe access to multiple destinations including schools. A wombat crossing will be constructed at the Grand Meadows Drive intersection in Hills Plain.$4,820,924$6,026,155
NSWTRANSPORT FOR NSWTransport for NSW (TfNSW) - HW09 - Lily Creek Flood Mitigation and Safety Improvement Project - New England Hwy BendemeerThis project will replace an existing twin box culvert with a new approximately 15m long concrete plank bridge to accommodate a 1:100 flood event. The existing pavement width is around 6 m which does not meet the standards required for a heavy vehicle route. The new alignment will be raised to match new bridge level and safety improvements include widening formation to 14.4m with a 1.4m widened centre line. In total, the project will upgrade approximately 660m of the road network on the New England Highway including a new bridge.$5,000,000$12,614,706
NSWTRANSPORT FOR NSWTransport for NSW (TfNSW) - MR63 s4380 Carrisbrooke - Pavement Rehabilitation and safety upgradesThe project will comprise of pavement rehabilitation and full depth shoulder widening of MR63 Segment 4380. The current segment sealed width is 7.2m. The project will widen the road to 8m formation, providing 3.5 travel lanes and 0.5m wide shoulders. Safety upgrades will include approximately 276m of new safety barriers and 6 new end terminals.$1,600,000$3,200,000
NSWTRANSPORT FOR NSWTransport for NSW (TfNSW) - Pavement Rehabilitation and safety upgrades, Waterfall Way, BellingenThe project will upgrade approximately 2 km of Waterfall Way of segment 1260, widening the pavement to achieve a consistent 9‑metre width with 1‑metre shoulders where feasible. Works include improving horizontal and vertical alignment, upgrading drainage, and adjusting property accesses. Overall, the project will enhance safety, accessibility, and network reliability for all road users.$2,357,860$4,715,720
NSWWollondilly Shire CouncilWollondilly Shire Council - Construction of a roundabout at the corner of Barkers Lodge Road and Argyle Street, PictonThe project will construct a fully mountable roundabout at the intersection of Barkers Lodge Road and Argyle Street, Picton, construct 2 new pedestrian crossings - Argyle Street and Barkers Lodge Road, upgrade drainage and install calming devices on Argyle Street on the approach to the pedestrian crossing and to the roundabout.$2,515,556$3,144,445
NSWWollondilly Shire CouncilWollondilly Shire Council - Design and construction of a new stormwater drainage system and reconstruction of Burragorang Road at Mount HunterThe project will upgrade the existing road and drainage network on Burragorang Road and Spring Creek Road by installing a new larger culvert to increase the capacity of water flow to make the road more flood resistant, installing a levee to funnel the water into the culvert, removal of a 22-metre length of the footpath bund upstream of the culverts and replacement with a footbridge or additional box culverts. Works will include earthworks upstream and downstream of the new culverts to transition to the existing creek channels, upgrade drainage on Spring Creek Road to connect into the Mount Hunter Rivulet, extend the footpath down Spring Creek Road and reconstruction of Burragorang Road from the eastern side of the culvert to the Spring Creek Road intersection.$2,171,341$2,714,176
NSWWollondilly Shire CouncilWollondilly Shire Council - Design and upgrade of Montpelier Drive, The OaksThe project will upgrade Montpelier Drive by widening and upgrading approximately 4.1km of the road across six sections, intersection upgrade at Barkers Lodge Road, including dedicated left and right-turn bays, improved line marking throughout the corridor, installation of approximately 1,500 reflective road markers and intersection upgrades at key cross-roads along the route.$5,000,000$7,881,124
NSWWollondilly Shire CouncilWollondilly Shire Council - Design and upgrade of Park and Myrtle Creek Avenues, TahmoorThe project will upgrade Park and Myrtle Creek Avenues, Tahmoor by upgrading and widening approximately 888m of road surface, constructing approximately 883m of concrete footpath, constructing approximately 1093m of kerb and gutter, installing 8 new kerb inlet pits, one headwall and 152m of stormwater pipe.$3,474,122$4,342,652
NSWWollondilly Shire CouncilWollondilly Shire Council - Design and Upgrade of Razorback Bridge over Racecourse Creek, RazorbackDesign and Upgrade of Razorback Bridge over Racecourse Creek, Razorback.$358,940$448,675
NTWest Daly Regional CouncilWest Daly Regional Council - Design and upgrade of Woodycupaldiya RoadThis project focuses on improving access and drainage conditions along Woodyculpidiya Road. At three key locations where water flows throughout the year, suitable drainage structures will be designed and constructed. These structures will allow water to pass safely beneath the road, helping to prevent flooding and ensuring the road remains usable in all weather conditions. In addition, an approximately 5-kilometre stretch of the road will be regraded to improve its surface and overall driving conditions. As part of this work, roadside drainage systems will also be developed along this section to effectively manage rainwater and reduce damage caused by poor drainage.$3,200,000$4,000,000
QLDCity of Moreton BayCity of Moreton Bay - Low‑Emission Pavement Rehabilitation of Investigator Drive, Caboolture SouthThe project is located on Investigator Drive, Caboolture South and extends between Matthew Flinders Drive and Bongaree Avenue. The scope comprises pavement rehabilitation over an approximate length of 472 metres, covering approximately 4,060 square metres of roadway. Works will include in‑situ rehabilitation of the existing pavement, comprising profiling of the existing asphalt surface, treatment and stabilisation of the underlying pavement layers, and placement of a new asphalt wearing course. These works will be delivered by an external specialist contractor. In addition, the project includes approximately 200 metres of kerb and channel renewal.$460,086$920,172
QLDDiamantina Shire CouncilDiamantina Shire Council - Construction of Concrete Floodways on the Griffiths Tank - Coorabulka and Springvale - Boulia roadThis project involves the construction of four concrete floodways and associated drainage on priority roads, each approximately 50 metres in length, to improve resilience, safety, and year-round accessibility of the rural road network in Diamantina Shire.$1,600,000$2,000,000
QLDDouglas Shire CouncilDouglas Shire Council - Whyanbeel Road SealingUpgrade approximately 1.83km of Whyanbeel Road from an unsealed to a sealed standard. Works will include widening of the existing road formation, completion of necessary earthworks, application of a two-coat bitumen seal, installation and improvement of drainage infrastructure, and provision of appropriate road furniture.$1,534,400$1,918,000
QLDGympie Regional CouncilGympie Regional Council - Eel Creek Road Widening 2026-28The project will deliver survey, geotechnical investigation, detailed design and construction to widen and strengthen approximately 1.52km of Eel Creek Road, Pie Creek. Works include reconstruction and widening of the existing road to provide consistent 9.0m sealed formation comprising two 3.5m traffic lanes and two 1m sealed shoulders, minor horizontal curve improvements, geometric improvements at intersections and property access, guardrail installation at bridge approaches, culvert widening where required, and associated signage and line marking.$2,800,000$3,500,000
QLDGympie Regional CouncilGympie Regional Council - Woondum Road Bridge (BN101) ReplacementThis project will replace the existing Woondum Road timber bridge (Bridge no.101) over Six Mile Creek with a new single-lane bridge. The works cover approximately 350 metres of Woondum Road, including demolition of the existing bridge, construction of a new bridge and abutments, upgraded approaches, concrete approach slabs, guardrail and bridge safety treatments, pavement tie-ins, and associated earthworks, drainage and site reinstatement.$1,662,096$2,077,620
QLDIpswich City CouncilIpswich City Council - Replacement of Strong Road Bridge, LanefieldThe project involves replacing the existing three-span, single-lane timber bridge on Strong Road in Lanefield - measuring 19.8 metres long and 4.2 metres wide - with a new precast concrete two-way single-lane bridge measuring 42.25 metres in length and 5.96 metres in width. The scope of work includes the installation of bridge rails, wing walls, scour protection, and associated road pavement construction.$4,534,430$5,668,037
QLDLockyer Valley Regional CouncilLockyer Valley Regional Council - Upgrade of Robinsons Road, GattonThe project will include widening of approximately 1.5 km of Robinson Road to a consistent 8.0m width, and a stronger pavement to heavy vehicle standard. An additional approximately 0.8 km of road will receive upgraded line marking and signage.$2,475,960$3,094,950
QLDMareeba Shire CouncilMareeba Shire Council - Granite Creek Crossing, Springmount Rd, MareebaDesign and construct new approximately 40-metre-long bridge and realign approaches over Granite Creek on Springmount Road, Mareeba Shire, QLD. The project will also remove a hazardous sharp curve and demolish low level culvert crossing.$5,000,000$10,000,000
QLDMornington Shire CouncilMornington Shire Council - Installation of Concrete Speed Humps - Lardil and Mukakiya StreetThe project will construct and install flat-top road humps and associated warning signs in accordance with the standards outlined in AS1742 Manual of Uniform Traffic Control Devices, in various locations on Lardil and Mukakiya Street, Gununa.$791,705$989,631
TASBuilding TasmaniaBuilding Tasmania - Replacement of Savage River Bridge and Guthrie Creek Bridge, Norfolk RoadThis project covers two standalone sites on Norfolk Road (Heemskirk Developmental Road): replacement of the existing Savage River timber bridge with a new single-span through steel girder bridge on bored pile-supported abutments, and replacement of the existing Guthrie Creek timber bridge with a single-cell precast box culvert crossing. The works include demolition of the existing timber structures, approach roadworks and pavement tie-ins, barriers and guardrail transitions, drainage and scour protection, traffic management, and all associated civil works required to commission the replacement structures. For Guthrie Creek, the adopted concept for this application is culvert only.$5,000,000$10,495,307
TASBurnie City CouncilBurnie City Council - Construction of Upper Natone Road Realignment, Upper NatoneThe project involves the construction of an approximately 250-metre road realignment on Upper Natone Road to bypass an active landslip area identified through geotechnical investigations.$3,125,040$3,906,300
VICBaw Baw Shire CouncilBaw Baw Shire Council - Falls Road Bridge Replacement and Approach Roads, NarracanReplace the currently closed Falls Road Bridge and improve approach roads over Narracan Creek to provide two-lane operation, increased load capacity and improved signing, delineation and drainage.$1,343,200$1,679,000
VICCity of DarebinCity of Darebin - High Street Streetscape Upgrade, PrestonHigh Street Preston Streetscape Upgrade comprises widened footpath with kerb outstands located at key intersections with raised threshold crossings. This layout will provide space for landscaping including new trees, street furniture including seating areas and safe, comfortable and efficient pedestrian movements.$3,328,000$6,768,000
VICGreater Shepparton City CouncilGreater Shepparton City Council - Shepparton Strategic Cycling Connection - Construction of cycling pathway to connect Victoria Park Lake, Shepparton Railway Station and linking to the Greater Shepparton Secondary CollegeThe project involves the construction of an approximately 1.8km section of the Strategic Cycling Corridor (SCC) that will connect Victoria Park, and the Shepparton Rail Station linking to the on-road cycling lane to Greater Shepparton Secondary College.$957,475$1,196,850
VICIndigo Shire CouncilIndigo Shire Council - Design and upgrade of Mcfeeters Road Bridge, BeechworthThe project will upgrade an existing 3.65m wide, 12m span, load limited vehicle bridge over Spring Creek to a compliant 4.5m width bridge meeting SM1600 design loads. The project will also involve upgrades to road approaches, road safety barriers and a pedestrian trail under the bridge.$660,000$825,000
VICMurrindindi Shire CouncilMurrindindi Shire Council - Design and upgrade of Back Eildon Road (Thornton) BridgeThis project is a design and construct replacement of the Back Eildon Road (Thornton) Bridge over the Goulburn River, including associated approach roadworks and safety infrastructure. Construction works will deliver a new reinforced concrete bridge. Associated civil works include asphalt surfacing to the bridge deck, reconstruction of approximately 1,700 m² of approach road pavement, construction of approach footpaths, drainage treatments in the bridge vicinity, installation of signage and line marking, and rock beaching with geotextile protection at the abutments.$5,000,000$7,953,306
VICShire of MoyneShire of Moyne - Design and Upgrade of Woorndoo-Streatham Road NERRIN NERRINThe project would see road widening and pavement improvements over a total combined length of approximately 7.55km on a key rural road linking the Glenelg Highway and Mortlake-Ararat Road in support of primary production. Of this, 4.7km would be widened to a 6.5m seal width, with pavement improvements and rehabilitation over a further 2.85km.$5,000,000$7,219,125
VICStrathbogie Shire CouncilStrathbogie Shire Council - Bridge Renewal, Design and Construct for reopening of Kirwans Bridge on Kirwans Bridge Road, Kirwans Bridge VICThis two-stage structural bridge renewal project will upgrade and restore the Kirwans Bridge crossing of the Goulburn River to be reopened. The design phase will establish the capacity tonne limit of the upgrade works and phase two construction will include structural strengthening to road safety standards, integration of heritage requirements, and drainage, approach roadworks, and traffic management improvements. Inclusions are structural rehabilitation of substructure and superstructure, replacement/strengthening of deteriorated piles, new reinforced concrete deck system, strengthening/corrosion protection of steel girders, barrier upgrades to current standards, design, approvals, certification and traffic management during works.$4,000,000$5,000,000
VICSurf Coast ShireSurf Coast Shire - Design & Construction Forest Road Widening and Road Safety UpgradesThe project will deliver safety and efficiency improvements on Forest Road between Larcombes Road and Great Ocean Road. The project will extend road widening on Forest Road to the south such that a consistent road corridor is provided on the narrow, high risk section between Gum Flats Road and Great Ocean Road with 2 x 3 m traffic lanes and 2 x 1.0 m shoulders to support mixed transport modes including heavy vehicles and vulnerable users (bicycles and motorcycles) safely. Road safety barrier will be installed at high risk locations along Forest Road to address known run off road crash patterns. Audio-tactile edge line-marking will be installed along the full length of Forest Road to further mitigate the existing run-off road crash pattern.$3,717,330$4,646,662
WAShire of KentShire of Kent - Upgrade and Seal North Fence RoadThe Project will widen and seal North Fence Road and include suitable drainage works. The whole road will be widened to a 9.2m pavement width and a 7.2m seal to accommodate heavy vehicle access. New advisory signs and delineation will be installed. In total the project will upgrade approximately 13.090km of the road network.$4,280,999$5,351,249
WAShire of Wyndham East KimberleyShire of Wyndham East Kimberley - Design and Upgrade of Carlton Hill Road - KununurraThis project will upgrade sections of Carlton Hill Road from unsealed to a 7-2 sealed formation width. Sections will include Weaber Plain Rd and Carlton Hill Road - Intersection works, Bridge 5122A sealed tie in works, Bridge 5350 sealed tie in works and Road and drainage construction from SLK 3.9 to 7.0.$4,000,000$5,000,000
WAShire of Wyndham East KimberleyShire of Wyndham East Kimberley - Upgrade of Barytes Road, WyndhamThis project will upgrade Barytes Road from SLK 0.0 to SLK 1.85, and Meatworks Road from SLK 0.0 to SLK 0.7. This approximately 2.55km road upgrade will widen 7m sealed width with 2m sealed shoulders. The project will include the installation of multiple stormwater culvert sets, service relocation, minor road realignment to accommodate Restricted Access Vehicles.$3,500,000$7,200,000