Skip to main content
  • Contact (Opens in a new tab/window)
Logo image Logo image
  • Home
  • About
    • National Initiatives
      • Major Projects Business Case Fund
      • Corridor Packages
    • Local Initiatives
      • Roads to Recovery Program
      • Black Spots Program
      • Heavy Vehicle Safety and Productivity Program
      • Local Roads and Community Infrastructure Program
      • Active Transport Fund
        • Successful Projects under the Active Transport Fund - Tranche 1
      • Bridges Renewal Program
      • Safer Local Roads Infrastructure Program
        • Successful Projects under the Safer Local Roads Infrastructure Program - Tranche 1
        • Successful Projects under the Safer Local Roads Infrastructure Program - Tranche 2
        • Successful Projects under the Safer Local Roads Infrastructure Program - Tranche 3
        • Successful Projects under the Safer Local Roads Infrastructure Program - Tranche 4
        • Table: Funded projects – Heavy Vehicle Rest Area Tranche 3
    • 2024-25 MYEFO
    • 2026-27 Budget announcements
    • Budget 2024-25 announcements
    • Infrastructure Investment Program Strategic Review
    • Road safety
  • Projects
    • Bruce Highway
    • Projects near me (Opens in a new tab/window)
    • Melbourne to Brisbane Inland Rail
    • Moorebank Intermodal Terminal Precinct
    • Northern Australia Roads Program and Northern Australia Beef Roads Program
    • Outback Way
    • Sydney Metro—Western Sydney Airport
    • Western Sydney Infrastructure Plan
  • Resources for funding recipients
    • Federation Funding Agreement Schedule
      • Project templates
    • The National Land Transport Network
    • Indigenous Employment and Supplier-use Infrastructure Framework
    • Innovative funding and financing
    • Cost Estimation Guidance
    • Safer Local Roads Infrastructure Program - Resources
    • Local Roads and Community Infrastructure Program resources
    • Roads to Recovery Program resources
    • Nominating a Black Spot
      • Site eligibility
      • Black Spots Program - Frequently Asked Questions
    • Active Transport Fund - Resources
    • Signage Guidelines
  • Contact (Opens in a new tab/window)
Search
  • Home
  • About
  • Projects
  • Resources for funding recipients

Infrastructure Investment Program

The Australian Government is committed to a 10-year, over $120 billion infrastructure investment pipeline, ensuring a rolling program of sustainable land transport infrastructure projects.

The Government is working in partnership with states and territories to deliver a credible and sustainable pipeline of projects which support a range of economic and social objectives, including productivity and resilience, sustainability and liveability.

Search for a place or project
Projects near me

Links

  • RPM Portal (Opens in a new tab/window)
  • Department (Opens in a new tab/window)
  • Ministers (Opens in a new tab/window)
  • australia.gov.au (Opens in a new tab/window)

Utilities

  • Feedback (Opens in a new tab/window)
  • Contact us (Opens in a new tab/window)
  • Disclaimer (Opens in a new tab/window)
  • Privacy (Opens in a new tab/window)

We acknowledge the traditional owners of the Country throughout Australia and their continuing connection to land, sea and community. We pay our respect to them and their cultures and to the Elders past and present.

©2026 Commonwealth of Australia

Return focus to the top of the page

Submissions or registrations of interest to be kept informed about the progress of this work, can be made directly via email to costestimation@infrastructure.gov.au or by using the form below.

Items marked with (required) are mandatory fields.

Maximum 3 files.
Allowed types: txt pdf jpg doc docx ppt pptx xls and xlsx.
The accumulated size of all files in this form cannot exceed 10 MB.

Australian Privacy Principle 5 Notice

Your submission, including any personal information supplied, is being collected by the department for the purpose of seeking public and industry comment on the approach and content of its proposed cost estimation guidance, in accordance with the Privacy Act 1988 (the Privacy Act).

Your personal information will be stored securely by the department. It may be used by the department to make further contact with you about the consultation process. Your personal information will not be disclosed to any other third parties, except in the circumstances outlined below.

Submissions, in part or full, including the name of the author may be published on the department's website or in the Government's response, unless the submission is confidential. Confidential submissions (including author name) will not be published. Private addresses and contact details will not be published or disclosed to any third parties unless required by law.

Submissions will only be treated as confidential if they are expressly stated to be confidential. Automatically generated confidentiality statements or disclaimers appended to an email do not suffice for this purpose. If you wish you make a confidential submission, you should indicate this by ensuring your submission is marked confidential.

Confidential submissions will be kept securely and will only be disclosed in the following circumstances:

  • in response to a request by a Commonwealth Minister;
  • where required by a House or a Committee of the Parliament of the Commonwealth of Australia; or where required by law.

The department may also disclose confidential submissions within the Commonwealth of Australia, including with other Commonwealth agencies, where necessary in the public interest.

Please note that in order to protect the personal privacy of individuals in accordance with the Privacy Act any submissions containing sensitive information, personal information or information which may reasonably be used to identify a person or group of people may not be published, even if not marked as confidential.

The department's privacy policy contains information regarding complaint handling processes and how to access and/or seek correction of personal information held by the department. The Privacy Officer can be contacted on (02) 6274 6495.

Watson Street, Cunnamulla - 118479-21QLD-RTR
Stormwater ponding on road way, infiltration of sealed surface causing pavement failure and potholes.Rehabilitation of pavement and kerb with a seal. Compact with roller, water truck and grader as well a concreting formworks and sealing.
Oxley Road (Katanning-Dumbleyung Road), Glencoe - 118335-21WA-RTR
This section of road is sealed and seriously needs potholes, rutting and correcting of low areas prior to re-sealing. Oxley Road (Katanning-Dumbleyung Road) will be part of the balance of program up until 2024 RTR program.Council proposes to top up the failed areas with gravel, stabilisation and mixing of the affected areas by a mechanical machine, final trim and seal which then will put this road back to its original condition.
Bookine Road (rural road) - 118447-21WA-RTR
Existing seal is badly potholed, uneven and has reached end of useful life.It is proposed to reseal the existing 7.2m seal for road length of 2.7 kilometres
Gingin Brook Road (rural road) - 118455-21WA-RTR
Overgrowth of vegetation along both sides of this road has created reduction in sight lines, vehicle damage, and drainage blockages is some areas.Both sides of full length of the road are to be verge mulched to provide appropriate sight line clearances and increased drainage access.Total cost of proposed project is $128,000
Gingin Brook Road (rural road) - 118456-21WA-RTR
Reseal of deteriorating section of road which services volumes of heavy traffic travelling between Brand Highway and Indian Ocean Drive and provides primary access to major industrial area for Gingin.It is proposed to reseal the existing 8 metre road for 3.25 kilometres.
Cheriton Road (rural road) - 118452-21WA-RTR
Existing gravel road has minimal levels of gravel remaining, is significantly potholed, and is narrow in places with traffic increasing due to rural residential development and truck movements.Following recent growth of rural residential estate on and to immediate west of this section of road, proposed works include widening of length to 8 metre trafficable width, gravel sheeted for full length of road section, with associated drainage clearing where required.
Whitfield Street, Guilderton - 118448-21WA-RTR
Low lying section of major access into tourist town with seal undermined by heavy traffic and water run off.Asphalt overlay to be applied to length of this section of road at 7 metre widith
Gunyipinya Road (rural road) - 118461-21NT-RTR
Wet season damage to road shoulder and excessive pot holesReconstruction of road shoulder off existing seal edge in addition to the dilapidated surface damage of pot holes
Galawara Road (rural road) - 118460-21NT-RTR
Road Surface condition and shoulder damage inclusive of drainage improvements / cleaningGeneral maintenance and formation grade and shoulder re-instatement inclusive of opening up entrances to silted off-shoot drainage entrances.
Willowburn Drive (rural road) - 118482-21SA-RTR
Surface deteriorationIt is proposed to repair the identified surface defects and reseal with asphalt to restore the roads surface.

Pagination

  • « First
  • ‹ Previous
  • 1716
  • 1717
  • 1718
  • 1719
  • 1720
  • 1721
  • 1722
  • 1723
  • 1724
  • Next ›
  • Last »

There are no matches for your search