Skip to main content
  • Contact (Opens in a new tab/window)
Logo image Logo image
  • Home
  • About
    • National Initiatives
      • Major Projects Business Case Fund
      • Corridor Packages
    • Local Initiatives
      • Roads to Recovery Program
      • Black Spots Program
      • Heavy Vehicle Safety and Productivity Program
      • Local Roads and Community Infrastructure Program
      • Active Transport Fund
        • Successful Projects under the Active Transport Fund - Tranche 1
      • Bridges Renewal Program
      • Safer Local Roads Infrastructure Program
        • Successful Projects under the Safer Local Roads Infrastructure Program - Tranche 1
        • Successful Projects under the Safer Local Roads Infrastructure Program - Tranche 2
        • Successful Projects under the Safer Local Roads Infrastructure Program - Tranche 3
        • Successful Projects under the Safer Local Roads Infrastructure Program - Tranche 4
        • Table: Funded projects – Heavy Vehicle Rest Area Tranche 3
    • 2024-25 MYEFO
    • 2026-27 Budget announcements
    • Budget 2024-25 announcements
    • Infrastructure Investment Program Strategic Review
    • Road safety
  • Projects
    • Bruce Highway
    • Projects near me (Opens in a new tab/window)
    • Melbourne to Brisbane Inland Rail
    • Moorebank Intermodal Terminal Precinct
    • Northern Australia Roads Program and Northern Australia Beef Roads Program
    • Outback Way
    • Sydney Metro—Western Sydney Airport
    • Western Sydney Infrastructure Plan
  • Resources for funding recipients
    • Federation Funding Agreement Schedule
      • Project templates
    • The National Land Transport Network
    • Indigenous Employment and Supplier-use Infrastructure Framework
    • Innovative funding and financing
    • Cost Estimation Guidance
    • Safer Local Roads Infrastructure Program - Resources
    • Local Roads and Community Infrastructure Program resources
    • Roads to Recovery Program resources
    • Nominating a Black Spot
      • Site eligibility
      • Black Spots Program - Frequently Asked Questions
    • Active Transport Fund - Resources
    • Signage Guidelines
  • Contact (Opens in a new tab/window)
Search
  • Home
  • About
  • Projects
  • Resources for funding recipients

Infrastructure Investment Program

The Australian Government is committed to a 10-year, over $120 billion infrastructure investment pipeline, ensuring a rolling program of sustainable land transport infrastructure projects.

The Government is working in partnership with states and territories to deliver a credible and sustainable pipeline of projects which support a range of economic and social objectives, including productivity and resilience, sustainability and liveability.

Search for a place or project
Projects near me

Links

  • RPM Portal (Opens in a new tab/window)
  • Department (Opens in a new tab/window)
  • Ministers (Opens in a new tab/window)
  • australia.gov.au (Opens in a new tab/window)

Utilities

  • Feedback (Opens in a new tab/window)
  • Contact us (Opens in a new tab/window)
  • Disclaimer (Opens in a new tab/window)
  • Privacy (Opens in a new tab/window)

We acknowledge the traditional owners of the Country throughout Australia and their continuing connection to land, sea and community. We pay our respect to them and their cultures and to the Elders past and present.

©2026 Commonwealth of Australia

Return focus to the top of the page

Submissions or registrations of interest to be kept informed about the progress of this work, can be made directly via email to costestimation@infrastructure.gov.au or by using the form below.

Items marked with (required) are mandatory fields.

Maximum 3 files.
Allowed types: txt pdf jpg doc docx ppt pptx xls and xlsx.
The accumulated size of all files in this form cannot exceed 10 MB.

Australian Privacy Principle 5 Notice

Your submission, including any personal information supplied, is being collected by the department for the purpose of seeking public and industry comment on the approach and content of its proposed cost estimation guidance, in accordance with the Privacy Act 1988 (the Privacy Act).

Your personal information will be stored securely by the department. It may be used by the department to make further contact with you about the consultation process. Your personal information will not be disclosed to any other third parties, except in the circumstances outlined below.

Submissions, in part or full, including the name of the author may be published on the department's website or in the Government's response, unless the submission is confidential. Confidential submissions (including author name) will not be published. Private addresses and contact details will not be published or disclosed to any third parties unless required by law.

Submissions will only be treated as confidential if they are expressly stated to be confidential. Automatically generated confidentiality statements or disclaimers appended to an email do not suffice for this purpose. If you wish you make a confidential submission, you should indicate this by ensuring your submission is marked confidential.

Confidential submissions will be kept securely and will only be disclosed in the following circumstances:

  • in response to a request by a Commonwealth Minister;
  • where required by a House or a Committee of the Parliament of the Commonwealth of Australia; or where required by law.

The department may also disclose confidential submissions within the Commonwealth of Australia, including with other Commonwealth agencies, where necessary in the public interest.

Please note that in order to protect the personal privacy of individuals in accordance with the Privacy Act any submissions containing sensitive information, personal information or information which may reasonably be used to identify a person or group of people may not be published, even if not marked as confidential.

The department's privacy policy contains information regarding complaint handling processes and how to access and/or seek correction of personal information held by the department. The Privacy Officer can be contacted on (02) 6274 6495.

Burke Street, Warragul - 102716-19VIC-RTR
Pavement failures, cracking, rutting, shovingReconstruct and resurface the pavement for a length of approximately 370mTotal cost of proposed project is $565,000
Waterloo Road Trafalgar - 102721-19VIC-RTR
Localised pavement failureRepair and reconstruct pavements in various sectionsTotal cost of proposed project is $166,253
Warragul Leogatha Rd - 102722-19VIC-RTR
Localised pavement failureRepair and reconstruct affected areasTotal cost of proposed project is $89,462
North Canal Road, Trafalgar - 102719-19VIC-RTR
Pavement failures, cracking, rutting, shovingReconstruction of failed pavement and resurfacing for approx 650m Works Involved: 1. Stabilise Existing Pavement – 200mm thick with 3% Cement 2. Import and overlay 150mm thick CL3 FCR 3. Primer seal – 10mm C170Total cost of proposed project is $107,801
Wondinong Paynesville Rd (rural road) - 102785-19WA-RTR
Numerous tight curves on sections of Wondinong Paynesville Rd between Wondinong Homestead and SLK 3.0 and on Wondinong Cue Rd between Wondinong Homestead and SLK 1.2. The intersection of these two roads is located at the gate of the Wondinong Homestead. This poses a safety issue to station traffic., inclusive of children and also to public travelling past the Homestead. There is evidence of vehicles leaving the pavement on several of the corners. The two sections are located within a low lying area subject to flooding and high water flows. As a result numerous washouts occur following rain events.Create a new section of straight road between SLK 3.0 on Wondinong Paynesville Rd and SLK 1.2 on Wondinong Cue Rd so that Traffic bypasses the Homestead, the horizontal alignment is improved and the section is realigned into a shorter, safer, straighter section of Road. The new section avoids the low lying area subject to high water flows & consequent damage. The bypass is 3.5km in length and involves clearing, construction of new formation, drainage and sheeting as the remaining budget allows. Sufficicent natural gravel and water have been located on site.
Harry Road (Rural Road) - 102407-19WA-RTR
Poor running surface and inadequate drainage and signage.Section 1 - Over the entire nominated section carry out reconstruction and gravel re-sheet with 150mm of gravel and improve drainage and signage. Section 2 - At locations with a poor running surface and/or inadequate drainage and signage reconstruct as required to rectify the problem at that location. In every case this will involve a gravel re-sheet with 150mm of gravel.Total cost of proposed project is $24,865
Jones East Road (Rural Road) - 102409-19WA-RTR
Poor running surface and inadequate drainage and signage.Gravel re-sheet and construct a 150 thick compacted pavement. Reconstruct and improve drainage and renew and improve signage.Total cost of proposed project is $50,362
Quanta Cutting-Weira Road (Rural Road) - 102408-19WA-RTR
Poor running surface and inadequate drainage and signage.Gravel re-sheet to and construct a 150 thick compacted pavement. Reconstruct drainage and improve signage.Total cost of proposed project is $61,753
Third Avenue, Arrawarra - 102799-19NSW-RTR
Local access road is too narrow and does not cater for the demands of 2 way traffic flow and adequate parking for residents and beach users. Pavement is under thickness and failing, with many surface failures. No drainage infrastructure along residential access side of the road.Provide kerb and gutter adjacent to residents houses. Box out and widen the pavement to enable 2 way traffic flow Place high spec granular pavement with 2 coat spray sealed surface Provide flush edging on non-resident side for additional parking capabilityTotal cost of proposed project is $987,701
Second Avenue, Arrawarra - 102797-19NSW-RTR
Local access road is too narrow and does not cater for the demands of 2 way traffic flow and adequate parking for residents and beach users. Pavement is under thickness and failing, with many surface failures. No drainage infrastructure along residential access side of the road.Provide kerb and gutter adjacent to residents houses. Box out and widen the pavement to enable 2 way traffic flow Place high spec granular pavement with 2 coat spray sealed surface Provide flush edging on non-resident side for additional parking capabilityTotal cost of proposed project is $772,298

Pagination

  • « First
  • ‹ Previous
  • 2062
  • 2063
  • 2064
  • 2065
  • 2066
  • 2067
  • 2068
  • 2069
  • 2070
  • Next ›
  • Last »

There are no matches for your search