Skip to main content
  • Contact (Opens in a new tab/window)
Logo image Logo image
  • Home
  • About
    • National Initiatives
      • Major Projects Business Case Fund
      • Remote Roads Upgrade Pilot Program
      • Corridor Packages
    • Local Initiatives
      • Roads to Recovery Program
      • Black Spots Program
      • Heavy Vehicle Safety and Productivity Program
      • Local Roads and Community Infrastructure Program
      • Active Transport Fund
        • Australian Capital Territory Active Transport Fund Projects
        • New South Wales Active Transport Fund Projects
        • Northern Territory Active Transport Fund Projects
        • Queensland Active Transport Fund Projects
        • South Australia Active Transport Fund Projects
        • Tasmania Active Transport Fund Projects
        • Victoria Active Transport Fund Projects
        • Western Australia Active Transport Fund Projects
      • Bridges Renewal Program
      • Safer Local Roads and Infrastructure Program
        • Successful Projects under the Safer Local Roads and Infrastructure Program - Tranche 1
        • Successful Projects under the Safer Local Roads and Infrastructure Program - Tranche 2
        • Successful Projects under the Safer Local Roads and Infrastructure Program - Tranche 3
        • Successful Projects under the Safer Local Roads and Infrastructure Program - Tranche 4
        • Table: Funded projects – Heavy Vehicle Rest Area Tranche 3
    • 2024-25 MYEFO
    • 2026-27 Budget announcements
    • Budget 2024-25 announcements
    • Infrastructure Investment Program Strategic Review
  • Projects
    • Bruce Highway
    • Projects near me (Opens in a new tab/window)
    • Melbourne to Brisbane Inland Rail
    • Moorebank Intermodal Terminal Precinct
    • Northern Australia Roads Program and Northern Australia Beef Roads Program
    • Outback Way
    • Sydney Metro—Western Sydney Airport
    • Western Sydney Infrastructure Plan
  • Resources for funding recipients
    • Federation Funding Agreement Schedule
      • Project templates
    • The National Land Transport Network
    • Indigenous Employment and Supplier-use Infrastructure Framework
    • Innovative funding and financing
    • Cost Estimation Guidance
    • Safer Local Roads and Infrastructure Program - Resources
    • Local Roads and Community Infrastructure Program resources
    • Roads to Recovery Program resources
    • Nominating a Black Spot
      • Site eligibility
      • Black Spots Program - Frequently Asked Questions
    • Active Transport Fund - Resources
    • Signage Guidelines
  • Contact (Opens in a new tab/window)
Search
  • Home
  • About
  • Projects
  • Resources for funding recipients

Infrastructure Investment Program

The Australian Government is committed to a 10-year, over $120 billion infrastructure investment pipeline, ensuring a rolling program of sustainable land transport infrastructure projects.

The Government is working in partnership with states and territories to deliver a credible and sustainable pipeline of projects which support a range of economic and social objectives, including productivity and resilience, sustainability and liveability.

Search for a place or project
Projects near me

Links

  • RPM Portal (Opens in a new tab/window)
  • Department (Opens in a new tab/window)
  • Ministers (Opens in a new tab/window)
  • australia.gov.au (Opens in a new tab/window)

Utilities

  • Feedback (Opens in a new tab/window)
  • Contact us (Opens in a new tab/window)
  • Disclaimer (Opens in a new tab/window)
  • Privacy (Opens in a new tab/window)

We acknowledge the traditional owners of the Country throughout Australia and their continuing connection to land, sea and community. We pay our respect to them and their cultures and to the Elders past and present.

©2026 Commonwealth of Australia

Return focus to the top of the page

Submissions or registrations of interest to be kept informed about the progress of this work, can be made directly via email to costestimation@infrastructure.gov.au or by using the form below.

Items marked with (required) are mandatory fields.

Maximum 3 files.
Allowed types: txt pdf jpg doc docx ppt pptx xls and xlsx.
The accumulated size of all files in this form cannot exceed 10 MB.

Australian Privacy Principle 5 Notice

Your submission, including any personal information supplied, is being collected by the department for the purpose of seeking public and industry comment on the approach and content of its proposed cost estimation guidance, in accordance with the Privacy Act 1988 (the Privacy Act).

Your personal information will be stored securely by the department. It may be used by the department to make further contact with you about the consultation process. Your personal information will not be disclosed to any other third parties, except in the circumstances outlined below.

Submissions, in part or full, including the name of the author may be published on the department's website or in the Government's response, unless the submission is confidential. Confidential submissions (including author name) will not be published. Private addresses and contact details will not be published or disclosed to any third parties unless required by law.

Submissions will only be treated as confidential if they are expressly stated to be confidential. Automatically generated confidentiality statements or disclaimers appended to an email do not suffice for this purpose. If you wish you make a confidential submission, you should indicate this by ensuring your submission is marked confidential.

Confidential submissions will be kept securely and will only be disclosed in the following circumstances:

  • in response to a request by a Commonwealth Minister;
  • where required by a House or a Committee of the Parliament of the Commonwealth of Australia; or where required by law.

The department may also disclose confidential submissions within the Commonwealth of Australia, including with other Commonwealth agencies, where necessary in the public interest.

Please note that in order to protect the personal privacy of individuals in accordance with the Privacy Act any submissions containing sensitive information, personal information or information which may reasonably be used to identify a person or group of people may not be published, even if not marked as confidential.

The department's privacy policy contains information regarding complaint handling processes and how to access and/or seek correction of personal information held by the department. The Privacy Officer can be contacted on (02) 6274 6495.

Forest Road, Orange - 103148-19NSW-RTR
Narrow road width, poor geometry and road pavement failures.Improve road drainage. Road reconstruction and widening.Total cost of proposed project is $1,908,000
Edward Street, Orange - 103149-19NSW-RTR
Poor ride quality. Pavement surface failures.Structural Asphalt overlay
Nowhere Else Road (Rural Road) - 103132-19SA-RTR
Road showing complete loss of sheeting sections, poor formation and drainage, scour of natural surface material and rutting under traffic.Resheeting of section of road.Total cost of proposed project is $158,000
Nowhere Else Road (Rural Road) - 103131-19SA-RTR
Road showing complete loss of sheeting in sections, poor formation and drainage, scour of natural surface and rutting under traffic.Resheeting of section of road.Total cost of proposed project is $143,000
Hetzel Road (Rural Road) - 103134-19SA-RTR
Loss of sheeting in sections, scour of surface material and rutting.Resheeting of section of road.Total cost of proposed project is $152,170
Barwang Road (Rural Road) - 103107-19NSW-RTR
Road pavement failures.Stabilisation of selected failures by addition of dry chemical, mix, compact ,trim and shape, then apply new seal on selected sections. Some section works are a precursor to reseal works scheduled later in the year.
Gardner Street, Rooty Hill - 103174-19NSW-RTR
Road is showing signs of failure, existing pavement dilapidated, localised pavement failure, severely scoured southern shoulder and damaged sections of kerb and gutter.It is proposed to stabilise base repair works, reseal existing pavement and repair of some sections of kerb and gutter. Project also includes trim, regrade and seal southern shoulder.
Belka East Road (rural road) - 103120-19WA-RTR
There is severe potholing throughout this salt area, this work is to preserve the seal that is present and thus keep the maintenance costs down in the future.Hot bitumen seal using 10mm stone.
Matsen Road, Bookara (Rural Road) - 103152-19WA-RTR
Lack of remaining gravel on the road surfacePropose to resheet road for a length of 0.5km and a width of 8km. Works to include reinstatement of table drains and instillation of new regulatory traffic signs and guide posts.Total cost of proposed project is $17,742
Yandanooka West Road, Milo (Rural Road) - 103153-19WA-RTR
Lack of remaining gravel on the road surfacePropose to resheet road for a length of 3km and a width of 8km. Works to include reinstatement of table drains and instillation of new regulatory traffic signs and guide posts.Total cost of proposed project is $119,367

Pagination

  • « First
  • ‹ Previous
  • 2077
  • 2078
  • 2079
  • 2080
  • 2081
  • 2082
  • 2083
  • 2084
  • 2085
  • Next ›
  • Last »

There are no matches for your search