- Funding program Roads to Recovery Program
- Status Completed
- Transport mode Road
- Expected start/finish Aug 2015 - Sep 2015
- Estimated project cost $300,000
- Australian Government contribution $300,000
- Local Council/Shire Shire of Upper Gascoyne
- State WA
Project description
Sections totalling 10km have a shallow uneven bedrock base resulting in previous sheeting being eroded by flood water and traffic.The surface is very rough and uneven for stock and tourist traffic and for a local indigenous community.Reform,sheet with suitable local material to 150mm and water bind and construct a water catchment drain along northern side of the road reserve to prevent future flood water damage.
Project last updated:
Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.