• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Mar 2019 - Jun 2019
  • Estimated project cost $488,557
  • Australian Government contribution $194,994
  • Local Council/Shire Shire of Wiluna
  • State WA

Project description

road requires additional drainage and floodway works to prevent pot holes and corrugations from water lying on the road, vegetation is also affecting clear line of site, gravel re-sheeting required to bring road up to suitable height for water to drain off road

gravel re-sheeting of various sections between slk 64.9 and 124.9, reformation of floodways, verge clearing and widening of pavement in various locations, installation of additional rock protection on floodway areas

Total cost of proposed project is $488,557

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.